background image

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900

www.bklighting.com • [email protected]

B-K LIGHTING

PROJECT:

TYPE:

Phase 1 - Rough In

Installation of Back box

1.  Install Conduit and Junction Box (by others) 

to be used with this product. 

2.  Install junction box so that front face is flush 

with finished wall or ceiling.

3.  Connect box to conduit and pull wires for 

connections (See Wiring diagram).

Additional Info

•  Please follow National and Local electrical codes for your area. 

Please refer to the low voltage design guide at www.bklighting.com/

lvguide before installation for proper wire selection. 

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

3167387

ETL LISTED

CONFORMS TO ANSI/UL STANDARD 1838,

CERTIFIED TO CSA STD C22.2 NO.250.7 

CSA STD C22.2 TIL B-58A  

RELEASED

12-12-11

REFERENCE

 

NUMBER

INS000971

SIGN STAR™ AND TWIN SIGN STAR™ 

Sign Lighting Installation Instructions

LINE

12V

FIXTURE

COM

Remote

Transformer

(by others)

COM

Wiring Diagram

Phase 2 - Finish Installation of Fixture with Remote Transformer.

1.  Install universal mounting ring (supplied with 

fixture) to junction box using appropriate 
hardware (By Others).  Align canopy mounting 
holes to final mounting position.

2.  Make two connections from remote 12V 

transformer to LED source leads (18 gauge 
wire) using proper wire connectors (By Others). 
See wiring diagram.

3.  Mount fixture canopy using two (2) #10-24 hex 

screws using 1/8” allen wrench. Do not over 
tighten.

4.   Use 5/32” allen wrench to loosen #10-32 

stainless steel black oxide socket head cap 
screw at the knuckle. Aim fixture to desired 
vertical location. Tighten to secure aiming 
position.

5.   Use 5/64” allen wrench to loosen stainless steel 

set screw on the 360SL™ rotational system and 
rotate to desired horizontal location. Tighten to 
secure aiming position.

TECHNOLOGY

with

Reviews: