background image

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

RELEASE DATE

01/24/2022

REFERENCE NUMBER

INS-2577-00

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF B-K LIGHTING, INC. AND ITS RECEIPT OR POSSESSION DOES NOT CONVEY ANY RIGHTS TO REPRODUCE, DISCLOSE ITS CONTENTS, OR TO 

MANUFACTURE, USE OR SELL ANYTHING IT MAY DESCRIBE.  REPRODUCTION, DISCLOSURE OR USE WITHOUT SPECIFIC WRITTEN AUTHORIZATION OF B-K LIGHTING, INC. IS STRICTLY FORBIDDEN.

ALTAIR

YOKE MOUNT

Standard Installation

2.  Line up fixture yoke to mounting location and 

secure with 3/4-10 hex bolt with adjustable 

crescent wrench.

Yoke Mount Installation

1.  Prepare for installation for yoke location. 

Clearance hole is 9/16” diameter.

9/16” Dia.

WIRING DIAGRAM

3.  Make watertight connections using waterproof 

wire connectors to connect incoming primary 

wiring to integral driver wiring as per NEC. 

Secondary side is factory wired. 

See wiring 

diagram.

HOT

LED

NEUTRAL

GROUND

HOT

NEUTRAL

GROUND

Inte

gr

al

DRIVER

+

-

0-10V -

0-10V +

0-10V -

0-10V +

Reviews: