Operating Instructions BA ULTIMATE
4 Preparation
65 56 083 D3560
.
201.10.02.02
19
4.3
Before each patient
Preparation _ Turbine
1. Purge the water and air channels for 30 seconds.
2. Attach the turbine [ → 21].
3. Insert the bur [ → 22].
4. Set a sufficient amount of cooling water (> 50 ml/min) [ → 23].
5. Use filtered water only (< 50 µm).
6. Check the nozzles for blockages and lime deposits, for example, and
clean the nozzles if necessary.
Overheating at the preparation site
CAUTION! Insufficient cooling leads to overheating of the
preparation site and damage to the tooth substance. Ensure that the
water content is > 50ml/min.
6556083.book Seite 19 Montag, 18. April 2016 4:35 16
Summary of Contents for BA Ultimate LED
Page 2: ...6556083_Titel fm Seite 2 Montag 18 April 2016 5 16 17...
Page 4: ...6556083 book Seite 2 Montag 18 April 2016 4 35 16...
Page 40: ...6556083 book Seite 38 Montag 18 April 2016 4 35 16...
Page 42: ...6556083 book Seite 2 Montag 18 April 2016 4 30 16...
Page 78: ...6556083 book Seite 38 Montag 18 April 2016 4 30 16...
Page 80: ...6556083_FR book Seite 2 Montag 18 April 2016 4 40 16...
Page 116: ...6556083_FR book Seite 38 Montag 18 April 2016 4 40 16...
Page 118: ...6556083_ES book Seite 2 Montag 18 April 2016 4 51 16...
Page 156: ...6556083_IT book Seite 2 Montag 18 April 2016 5 02 17...
Page 192: ...6556083_IT book Seite 38 Montag 18 April 2016 5 02 17...
Page 194: ...6556083_NL book Seite 2 Montag 18 April 2016 5 12 17...
Page 230: ...6556083_NL book Seite 38 Montag 18 April 2016 5 12 17...