![B.A. International BA Ultimate LED Operating Instructions Manual Download Page 20](http://html1.mh-extra.com/html/b-a-international/ba-ultimate-led/ba-ultimate-led_operating-instructions-manual_3111414020.webp)
4 Preparation
Operating Instructions BA ULTIMATE
18
65 56 083 D3560
.
201.10.02
.
02
4
Preparation
4.1
Initial start-up and longer breaks in use
Turbine
✔ The turbine is only able to reach full power if indicated operating
pressures are set [ → 14]. If necessary have the pressures checked
by a service engineer with a star tester that is placed between the
supply hose and the quick coupling.
➢ Sterilize the turbine and accessory parts prior to startup.
➢ Clean and maintain the turbine after longer breaks in use.
4.2
Prior to starting the work day
➢ Purge the water and air channels for 30 seconds.
6556083.book Seite 18 Montag, 18. April 2016 4:35 16
Summary of Contents for BA Ultimate LED
Page 2: ...6556083_Titel fm Seite 2 Montag 18 April 2016 5 16 17...
Page 4: ...6556083 book Seite 2 Montag 18 April 2016 4 35 16...
Page 40: ...6556083 book Seite 38 Montag 18 April 2016 4 35 16...
Page 42: ...6556083 book Seite 2 Montag 18 April 2016 4 30 16...
Page 78: ...6556083 book Seite 38 Montag 18 April 2016 4 30 16...
Page 80: ...6556083_FR book Seite 2 Montag 18 April 2016 4 40 16...
Page 116: ...6556083_FR book Seite 38 Montag 18 April 2016 4 40 16...
Page 118: ...6556083_ES book Seite 2 Montag 18 April 2016 4 51 16...
Page 156: ...6556083_IT book Seite 2 Montag 18 April 2016 5 02 17...
Page 192: ...6556083_IT book Seite 38 Montag 18 April 2016 5 02 17...
Page 194: ...6556083_NL book Seite 2 Montag 18 April 2016 5 12 17...
Page 230: ...6556083_NL book Seite 38 Montag 18 April 2016 5 12 17...