
3
1-
Introduction
We thank you for having chosen our Heat pump.
This installation and maintenance notice contains the necessary
information to its installation (delivery control, the installation, the
connections) and to its repair. It is a complementary document to the
user’s manual which describes its instructions for use.
We invite you to read it first.
2-
Caution
This document is an integral part of the product and it must stays in
the technical room.
This Heat pump is exclusively for heating swimming pools.
Any other use not in conformity and random will be considered as
dangerous and unsuitable.
The assembly, the electric connection and the start up must be
carried out by specialized and professional person.
When connect plug to socket (power supply), please
make sure that live wire, neutral wire, earth wire to
plug should be connected as right drawing.
It is essential to maintain the temperature in the swimming pool lower
than the recommended value by the swimming pool’s manufacturer.
Please make sure that minimum water flow speed is 3.0m
³
/h.
In a concern to a constant improvement, our products can be modified
without notice; the present pictures in this note or the characteristics
which are described are not contractual.
16A 250V ~
(L)
(N)
Summary of Contents for BP-50WS-C
Page 1: ...Directions for installation and maintenance...
Page 6: ...6...
Page 11: ...11 Electric diagram...