Aztec Grand Finale Owner'S Manual Download Page 6

4. Open the Grand Finale body by removing the

two screws in the bucket shelf. Hook up the

battery according to instructions on the base

floor.

5. After performing steps 7 and 8 below, place

solution or finish container on Grand Finale

and insert the suction hose into container.

PREPARING FOR OPERATION

Note: Always pre-sweep or dust mop floor.

Debris in pad can cause streaks.
6. Make sure battery is fully charged. If not,

connect the power cord to the receptacle on

the back of the body. Connect to a power

source and charge battery until "Charged" light

is lit. Remove power cord when battery is fully

charged.

7. Pour about one quart of finish or coating

solution into the Grand Finale bucket and

saturate pad in solution.

8. Wring out pad and lay flat on floor, back side up.

9. Pull back on lift handle to raise head assembly

and pad holder. Lower pad holder onto

saturated pad.

OPERATION

10. Turn control switch to PRIME/CLEAN and

hold in that position until finish/solution

sprays from head assembly. Release to

return switch to OFF position, then move

switch to RUN.

11. Turn flow control to desired setting. Higher

viscosity fluids will require a numerically

higher setting.

12. Pull Grand Finale backwards about 20 feet

and check coverage.

13. Adjust flow control to get coverage desired.

OPERATING TIPS

1. Turn flow control switch to zero, 10 feet

before finishing an area to minimize dripping.

2.  If floors are thoroughly stripped or have not

been coated before, walk slow and increase

flow for the first coat. This will eliminate

streaking.

3.  Not all finishes are the same. It may be

necessary to try different settings or walking

speeds for optimal results.

4.  Walk at a comfortable speed. Do not walk

faster than the applicator can evenly spread

the finish.

5.  Turn flow control switch to zero before

making the turn at end of each pass to

prevent over saturation of pad. Turn control

switch back to desired flow setting after

making each turn.

6.  Push Grand Finale straight forward toward

corner after making turn.

7.  Pull straight back until pad is past wet edge.

8.  Swing Grand Finale outside wet edge and

push forward.

9.  Continue parallel to first pass overlapping first

pass 4".

10. Continue process until entire floor is covered,

leaving an exit path. Shut off solution supply

10 feet before finish to minimize dripping.

GRAND FINALE  PG. 3

IMPORTANT

!

Always check the distribution tube to make

sure all holes are open.

Always remember to turn the control switch

to RUN when resuming normal operation.
When applying finish to large areas, the

finish may dry before the next pass is made.

Finish smaller sections at a time so you can

always keep a wet edge to overlay.

WARNING

!

PG. 6  GRAND FINALE

GRAND FINALE BODY PARTS LIST

#

PART #

DESCRIPTION

QTY

1

050-270

Quick Coupling Body

1

2

050-320

Hose Clamp (Steel)

2

3

050-120

Check Valve

1

4

050-230

Axle Bumper

1

5

283-050-185

Axle Sensor Bracket

1

6

050-140

Axle Sensor

1

7

050-151

Suction Tube Assembly

1

8

050-310

Hose Clamp (Nylon)

3

9

288-050-170

Pad Holder Support Assembly

1

10 050-3AMP

Fuse 3 Amp (Battery)

1

11 283-050-160

Battery Hold Down Bracket

1

12 050-170

Battery (12 Volt)

1

13 050-5AMP

Fuse 5 Amp (Pump)

1

14 050-390

Pump

1

15 050-330

2 " Swivel Caster

1

16 288-050-190

Steel Body Frame Assembly

1

17 218-.5-304 SS BAR Axle

1

18 050-220

Axle Cap Nut

2

19 156-050-1

10x1.75 Wheel w/Bushing

1

20 156-050-2

10x1.75 Wheel w/Bearing

1

21 050-160

Axle Flange Bearing

2

22 050-420

Magnet Mount Bushing Assembly

1

23 153-050-1

Wire Harness assembly

1

24 283-050-150

Suction Tube Plate

1

25 050-290

Quick Coupling Insert

1

26 283-050-140

Lift Handle Adjustment Bracket

1

27 283-050-135

Lift Handle

1

28 283-050-145

Lift Handle Support Bracket

1

29 108-050

Body (Plastic)

1

30 050-130

Battery Charger 12V 1.5 Amp

1

31 050-400

Power Receptical

1

32 288-050-155

Battery Charger Mount Plate Assembly

1

33 283-050-195

Handle

1

34 050-190

Body Spacer

2

SETTINGS FOR 

36" GRAND FINALE

Surface Type

Flow Setting

Floor Finish/Sealer on VCT

1 1/2 - 2 1/2

Concrete/Gym Coating

3-8

Summary of Contents for Grand Finale

Page 1: ...RYVILLE PA 18936 215 393 4700 800 331 1423 FAX 215 393 4800 WARNING READ THESE INSTRUCTIONS BEFORE USING will will our hen e of not ea her ase eck you not and Grand Finale Finish Applicator www aztecp...

Page 2: ...cal receptacle with a grounding conductor as shown in Figure 1 If a properly grounded electrical receptacle is not available an adapter see Figure 2 can be used to temporarily connect this plug to a 2...

Page 3: ...G TIPS 1 Turn flow control switch to zero 10 feet before finishing an area to minimize dripping 2 If floors are thoroughly stripped or have not been coated before walk slow and increase flow for the f...

Page 4: ...place 10 Place cleaning tray in front of Grand Finale and position head over tray 11 Turn Control knob to PRIME CLEAN and allow cleaning water to flow through the head manifold for about 15 seconds or...

Page 5: ...h after 24 hours Pump will not run Switch is off Put switch in the ON position Battery is discharged Test by switching to the prime position If the pump fails to run the battery needs to be charged Ha...

Page 6: ...Fuse 5 Amp Pump 1 14 050 390 Pump 1 15 050 330 2 Swivel Caster 1 16 288 050 190 Steel Body Frame Assembly 1 17 218 5 304 SS BAR Axle 1 18 050 220 Axle Cap Nut 2 19 156 050 1 10x1 75 Wheel w Bushing 1...

Page 7: ...Assembly 1 5 288 050 115 24 24 Manifold Housing Assembly 1 288 050 115 36 Manifold Housing Assembly 1 6 625 32854440 Spring Latch Pin 2 7 050 200 Applicator Spacer 4 8 050 350 Manifold Mounting Clip...

Page 8: ...nt we rely heavily on returned defective or failed parts so that we can examine the causes of failure While this may at first seem to be an inconvenience ultimately you benefit from safer better desig...

Reviews: