Aztec 902-762 Handbook Download Page 6

902-762 Four Panel Circular Aztec Climber 

Designed for Ages 5-12 

Page 

6

 

Rev. 04/9/2010 

SportsPlay Equipment, Inc.,  5642 Natural Bridge, St. Louis, MO 63120   (314) 389-4140 

www.sportsplayinc.com 

STEP #2:  Place all posts in their proper locations.  Attach a plastic 

panel to the short welded frame, paying close attention to the 
dragon/snake figure (see image).  Place a bolt and washer through 
a bolt cap and then through the Aztec panel and tabs on the frame 
and out the back side of the panel.  Then slide another cap and 
washer over the bolt and hand tighten nut (see bolt configuration 
image).  Install hardware in all three holes on that panel. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

STEP #3:  Brace that frame (bracing example can be found on page 2 of these 

instructions) and connect that panel to the bent vertical post 
following the same bolt configuration in the previous steps.   
  

STEP #4: 

Repeat steps 2 and 3 using all illustrations as a 

guide for the remaining posts and panels.

 

 

STEP #5:  Plumb & level entire unit. Fully snug all fasteners. Push bolt 

caps in to bolt covers. Pour Concrete with slight dome to ensure 
proper drainage.  Wait 48 hours before removing braces. Install 
resilient safety surfacing. 
 

STEP #6:

 

Attach Warning Label and Manufacturer’s Identification Label to a 
clean surface.  The Labels should be attached in a location where 
they are clearly visible and legible and away from normal hand 

 
 

 

 

Nut 

Washer 

Flat Washer 

Bolt Cover 

M10 Bolt 

Bolt cover Cap 

Not pictured 
– 

bolt cover

 

Aztec Panel 

Post Tab 

Bolt Configuration Image 

 

Panel Attachment Illustration 

Summary of Contents for 902-762

Page 1: ...cause serious injury Periodical inspections maintenance repair and or replacement of damaged parts is necessary for safe operation of equipment Appropriate publications available at no charge from th...

Page 2: ...sfactory in most applications for pipe sizes up to 4 1 2 diameter Varying soil climatic conditions may require deeper and heavier footings in some areas Check local building codes Detail Detail Perman...

Page 3: ...902 762 Four Panel Circular Aztec Climber Designed for Ages 5 12 Page 3 Rev 04 9 2010 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 www sportsplayinc com FOOTING LAYOUT...

Page 4: ...902 762 Four Panel Circular Aztec Climber Designed for Ages 5 12 Page 4 Rev 04 9 2010 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 www sportsplayinc com USE ZONE...

Page 5: ...led After assembly is complete ANY ENDS OF BOLTS PROTRUDING BEYOND NUTS SHOULD BE CUT OFF AND OR PEENED OVER TO REMOVE ANY SHARP EDGES Go over entire unit to file smooth any sharp edges or projections...

Page 6: ...e bracing example can be found on page 2 of these instructions and connect that panel to the bent vertical post following the same bolt configuration in the previous steps STEP 4 Repeat steps 2 and 3...

Page 7: ...Page 7 Rev 04 9 2010 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 www sportsplayinc com and foot placement areas The Labels must be replaced if they become illegible des...

Reviews: