Aztec 902-762 Handbook Download Page 5

902-762 Four Panel Circular Aztec Climber 

Designed for Ages 5-12 

Page 

5

 

Rev. 04/9/2010 

SportsPlay Equipment, Inc.,  5642 Natural Bridge, St. Louis, MO 63120   (314) 389-4140 

www.sportsplayinc.com 

 
GENERAL MAINTENANCE INSTRUCTIONS: 

 

 

Check MONTHLY for loose bolts, damaged or broken parts.  Tighten and/or 
replace immediately. Replace any parts that show a reduction of 25% 
from the original size. 
 

GENERAL ASSEMBLY INSTRUCTIONS: 

 
Check all the parts and hardware with the packing list to be sure you 
have received everything needed to assemble this product.  CONTACT YOUR 
LOCAL DISTRIBUTOR WITH NOTIFICATION OF ANY MISSING OR DAMAGED PARTS.  
Contact must be made within ten days of receipt of your order. 
Only hand-tighten nuts & bolts on initial assembly.  Final tightening 
should be done EVENLY after final assembly when unit has been plumbed & 
leveled.   
After assembly is complete, ANY ENDS OF BOLTS PROTRUDING BEYOND NUTS 
SHOULD BE CUT OFF AND/OR PEENED OVER TO REMOVE ANY SHARP EDGES.  Go 
over entire unit to file smooth any sharp edges or projections that may 
have been caused by rough handling in shipping or installation.  
 

ASSEMBLY AND INSTALLATION: 

 

 

NOTE: 

All threaded ends of bolts protruding beyond nuts must be cut off 
and/or peened to eliminate sharp edges.  No more than two threads 
should extend beyond face of nut. All washers, “T” nuts, and 
other fastener hardware used on round pipe or tubing must be 
hammered down to conform to the curved underlying surface to 
eliminate catch points. All Bolts must be covered with Bolt Caps 
and Covers 
 

 

STEP #1:  Using Footing Diagram as a guide, mark and dig footing holes. 

Footing holes are to be 1’-6” deep x 1’-6” in diameter, depending 
upon amount of resilient safety surfacing used, local climate and 
soil structure, and topography of land. The hole should then be 
filled with dry concrete or stone leaving 1’ of the hole open for 
the post. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for 902-762

Page 1: ...cause serious injury Periodical inspections maintenance repair and or replacement of damaged parts is necessary for safe operation of equipment Appropriate publications available at no charge from th...

Page 2: ...sfactory in most applications for pipe sizes up to 4 1 2 diameter Varying soil climatic conditions may require deeper and heavier footings in some areas Check local building codes Detail Detail Perman...

Page 3: ...902 762 Four Panel Circular Aztec Climber Designed for Ages 5 12 Page 3 Rev 04 9 2010 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 www sportsplayinc com FOOTING LAYOUT...

Page 4: ...902 762 Four Panel Circular Aztec Climber Designed for Ages 5 12 Page 4 Rev 04 9 2010 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 www sportsplayinc com USE ZONE...

Page 5: ...led After assembly is complete ANY ENDS OF BOLTS PROTRUDING BEYOND NUTS SHOULD BE CUT OFF AND OR PEENED OVER TO REMOVE ANY SHARP EDGES Go over entire unit to file smooth any sharp edges or projections...

Page 6: ...e bracing example can be found on page 2 of these instructions and connect that panel to the bent vertical post following the same bolt configuration in the previous steps STEP 4 Repeat steps 2 and 3...

Page 7: ...Page 7 Rev 04 9 2010 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 www sportsplayinc com and foot placement areas The Labels must be replaced if they become illegible des...

Reviews: