background image

 

  

 

Copyright © Azoteq (Pty) Ltd 2021. 

AZBAT48100B Product Manual 

Page 16 of 17 

 

 

All Rights Reserved. 

 

Revision 1.00 

February 2021 

 

 

 

Azoteq

PowerSense

®

 Series

 

 

Appendix A: Expanded DIP Settings 

Summary of Contents for AZBAT48100B

Page 1: ...g instructions in this document before operating the battery Table of Contents LITHIUM IRON PHOSPHATE BATTERY 1 AZBAT48100B 1 PRODUCT MANUAL 1 REVISION HISTORY 2 DISCLAIMER 2 OVERVIEW 2 PRODUCT INFORM...

Page 2: ...48100B incorporates 30x 3 2V 15S2P configuration 50Ah Lithium Iron Phosphate LiFePO4 cells with a 1C charge and discharge rating The battery incorporates a battery management system BMS which provides...

Page 3: ...teq Pty Ltd 2021 AZBAT48100B Product Manual Page 3 of 17 All Rights Reserved Revision 1 00 February 2021 Azoteq PowerSense Series Product Information Production dimensions Figure 1 AZBAT48100B physica...

Page 4: ...arge Voltage 54 8V Float Sustain Voltage 54V Standard Charge 30A 0 3C Maximum Charge 50A 0 5C BMS protection for higher charge current Standard discharge 50A 0 5C Maximum Discharge 95A 0 95C BMS Commu...

Page 5: ...erature recovery 15 C Environmental over temperature protection 70 C Environmental temperature recovery 60 C Environmental under temperature 20 C Environmental under temperature recovery 15 C Power ov...

Page 6: ...ned on initially Please refer to Table 3 for the LED indicator definitions Switching ON This is done with a short press and release of the switch after which the green RUN LED will start to flicker gr...

Page 7: ...SOC DESCRIPTION GREEN RED GREEN GREEN GREEN GREEN SHUT DOWN SLEEP OFF OFF OFF OFF OFF OFF ALL OFF STANDBY NORMAL FLASH 1 OFF OFF OFF OFF OFF STANDBY STATUS CHARGE NORMAL ON OFF BASED ON CAPACITY HIGH...

Page 8: ...port definitions The battery has a two RJ45 MODBUS RS485 communication ports and one RJ45 CANBUS port Please refer to the tables below for the port definitions Figure 4 RJ45 network cable pin referen...

Page 9: ...s 2 CANBUS communication cable usually supplied with the inverter 3 Parallel communication cable when using multiple batteries 4 Ground cable and screw M5 to earth the battery to the installation 5 DC...

Page 10: ...e the polarity of the connection between the inverter and the batteries are correct 6 Connect the RS485 cables between the batteries when using multiple batteries a As depicted by the yellow connectio...

Page 11: ...es on the inverter should match the values as in Table 5 These values should update automatically on the inverter The battery voltage charge and discharge current SOC value and battery temperature wil...

Page 12: ...ghts Reserved Revision 1 00 February 2021 Azoteq PowerSense Series Table 5 Address DIP switch configuration OF BATTERIES ADDRESS SETTING CHARGE CURRENT DISCHARGE CURRENT 1 MASTER 45A 95A 2 MASTER 55A...

Page 13: ...on top of each other when using multiple batteries in parallel Each battery should be installed on a mounting plate to allow air circulation Please refer to Appendix A for an expanded list of address...

Page 14: ...e inverter is not powered from AC mains while connecting the battery 6 It is advised to use suitable protection between the battery and the inverter 7 Make sure the polarity positive and negative conn...

Page 15: ...the material safety datasheet MSDS for the batteries on the Azoteq website Leaking cells 1 In the event of a cell leaking liquid or gas take caution to prevent any contact with the skin and eyes and i...

Page 16: ...Copyright Azoteq Pty Ltd 2021 AZBAT48100B Product Manual Page 16 of 17 All Rights Reserved Revision 1 00 February 2021 Azoteq PowerSense Series Appendix A Expanded DIP Settings...

Page 17: ...for any purpose Azoteq disclaims all warranties and conditions with regard to these products and information including but not limited to all implied warranties and conditions of merchantability fitne...

Reviews: