AZEK TimberTech Impression Rail Express 6 Installation Manual Download Page 4

Page 4

INSTALLING DRINK RAIL – LEVEL PANELS 

FOR IMPRESSION RAIL EXPRESS

®

FOR BEST RESULTS WITH OVER-THE-POST APPLICATIONS :
As is the case when using wood, Over-the-Post applications using TimberTech deck boards in which 

boards are mitered in the corners or that use butt joints mid-span are susceptible to those joints 

opening up or separating over time with changes in temperature. While it may be impossible to 

completely eliminate joints from separating, there are steps you can take to minimize the separation of 

the joints. We recommend the following:
A.  It is critical that all Post heights are aligned. In some cases, due to deck surface undulation, the 

length of posts will vary in order to achieve a level sight line with your top drink rail.

B.  Avoid using butt joints whenever possible. Utilization of butt joints may result in gapping of boards. 

Good practice is to use a single 16' board rather than using two 8' deck boards

C.  Follow all fastener recommendations clearly.
D.  Before installing deck boards as drink rails, take all possible measures to keep the temperature 

of the boards as low as possible. The cooler the board at installation, the less apt joints will be to 

separate or gap. For best results and to minimize gapping, do not store or install deck boards in 

direct sunlight.

E.  Install all joints tight. Unlike wood boards used in decking applications in which some spacing 

between boards may be recommended, there should be NO gap between the ends of TimberTech 

composite deck boards when installed as a drink rail.

F.   Not recommended to use narrow width (3.5") deck boards in Over-the-Post applications.

Be sure to cut posts such that 

finished rail height is at least 36" 

high for a 36" rail application and 42" 

high for a 42" application. For a 36" 

application, posts typically should 

not be cut less than 35.25". For a 42" 

application posts typically should not 

be cut less than 41.25".

For all rail installations, posts must 

be plumb and aligned with one 

another.
For Over-the-Post applications, 

it is also critical that Posts be of a 

consistent height (e.g. the tops of all 

posts are level and on plane with each 

other).
TIP: To ensure that the tops of all 

posts are level, you may use a level 

panel or a string line to establish a 

common level across all posts and 

cut at that level. Alternatively, you 

may use a laser level to “shoot” a level 

mark on each post and then cut at 

that mark.

For a proper finished look on Over-

The-Post Drink Rail applications, 

make sure Bottom Rail Cover is 

even with the top of the posts. Prior 

to installing rail assembly to Post, 

ensure that rail assembly is positioned 

(height wise) to eliminate any gaps 

between Deck board and Bottom Rail 

Cover (inverted, positioned on top). 

(Dia. A)

.

Bottom Rail Cover

Drink Clip

Support Rail

Bottom Rail Cover

Support Rail

Center and measure 

top of Deck Board 

a consistent distance 

from top of Post. 

Center and align 

bottom of Deck 

Board with top 

of Post.

Drink Rail (deck board)

Post Cap

Post

Balusters

Dia. A

2. OVER-THE-POST 

APPLICATIONS

IMPORTANT NOTES:

These instructions cover installation of the Drink Rail (Deck 

board Top Rail)

 on Impression Rail Express

®

 Level Panels.

These instructions 

DO NOT cover the entire level rail assembly process. Please 

follow through step 3 on pages 4-9 in TimberTech Impression Rail Express

®

 Install 

Guide to build stair rail assembly prior to installing Drink Rail.
The full 

TimberTech Impression Rail Express

®

 Install Guide can be found at  

www.TimberTech.com

.

This Installation Guide applies to the 

use of this product in a Drink Rail 

application. If you are completing a 

standard TimberTech railing installation, 

please refer to the full 

TimberTech 

Impression Rail Express

®

 Installation 

Guide found at 

www.TimberTech.com

.

1. BETWEEN-THE-POST 

APPLICATIONS

– OR –

Summary of Contents for TimberTech Impression Rail Express 6

Page 1: ...TimberTech com INSTALLATION GUIDE INSTALLING DRINK RAIL ON LEVEL PANELS 4 INSTALLING DRINK RAIL ON STAIR PANELS 8 DRINK RAIL FOR IMPRESSION RAIL EXPRESS ...

Page 2: ...ype drill drivers can increase the risk of overdriving fasteners SAFETY Always wear goggles when handling cutting drilling and fastening materials Failure to install this product in accordance with applicable building codes and TimberTech s written Impression Rail Express Install Guide may lead to personal injury affect rail system performance and void the product warranty The buildup or generatio...

Page 3: ...st Panel Kit 1 Pre Assembled Panel 8 or 6 length Impression Rail Express Bottom Rail Cover 1 Bottom Rail Cover 8 or 6 length to be used as a top rail cover Impression Rail Express Drink Rail Kit for two 8 panels or three 6 panels 12 Drink Rail Clips 24 8x3 4 Self Drilling Screws 48 8x3 4 SS MOD Truss K Lath Screws phillips head Drink Rail 1 Drink Rail deck board not included must be purchased sepa...

Page 4: ...s typically should not be cut less than 35 25 For a 42 application posts typically should not be cut less than 41 25 For all rail installations posts must be plumb and aligned with one another For Over the Post applications it is also critical that Posts be of a consistent height e g the tops of all posts are level and on plane with each other TIP To ensure that the tops of all posts are level you...

Page 5: ... Rail deck board Over the Posts Application measure to posts on center boards up to 16 Bottom Rail Cover inverted purchased separately measure between posts Trim deck board corners for a clean finish Dia 1A Dia 1B INSTALLING DRINK RAIL LEVEL PANELS FOR IMPRESSION RAIL EXPRESS ATTACH DRINK RAIL CLIPS TO PANEL Attach drink rail clips every 18 max by running 2 8 TEK SS screws from drink rail hardware...

Page 6: ...e during post bracket attachment remove afterwards While holding wood insert install screws from Panel Attach Kit through bracket and post into wood insert Dia 3A For Over the Post Applications fasten deck board to wood post inserts with 3 2 1 2 length AZEK Cortex or TOPLoc screws on either side of the butt joint Fasten no closer than 3 4 from the outside edge and ends of each plank Dia 3B 3C Make...

Page 7: ...th the Drink Rail Clip Kits IMPORTANT NOTE Set the Drink Rail in place and use the Drink Clip holes to mark locations Then drill 1 8 diameter hole deep into the bottom of the deck board Care must be taken not to drill through the top of the deck plank 8x3 4 SS MOD Truss K Lath Screws phillips head Impression Rail Express Drink Rail Clip Assembly Drink Rail deck board Over the Posts Application Bot...

Page 8: ...it in the first opening and should be placed in the first full opening as close to the post as possible These instructions cover installation of the Drink Rail Deck board Top Rail on Impression Rail Express Stair Panels These instructions DO NOT cover the entire level rail assembly process Please follow through step 3 on pages 10 12 in TimberTech Impression Rail Express Install Guide to build stai...

Page 9: ...ews from drink rail hardware up through the clip into the rail Dia 2 6 panels require 4 clips attached within the first baluster on each end and then spread equally over the length of the panel 8 panels require 6 clips attached within the first baluster on each end and then spread equally over the length of the panel For Over the Post applications proceed to Step 3 For Between the Post application...

Page 10: ...inserts from 4x4 wood boards to fit inside posts Run one 2 3 screw into the wood insert to hold it in place during post bracket attachment remove afterwards While holding wood insert install screws from Panel Attach Kit through bracket and post into wood insert Dia 3A For LEVEL Over the Post Applications fasten deck board to wood post inserts with 3 2 SS Cortex or applicable TOPLOC screws not incl...

Page 11: ...ne involved in the project including but not limited to wearing the appropriate safety equipment Except as contained in the written limited warranty The AZEK Company does not provide any other warranty either express or implied and shall not be liable for any damages including consequential damages ATTACH POST CAPS BETWEEN THE POST APPLICATIONS 5 4 ATTACH DRINK RAIL CLIPS TO DECK BOARD Place the D...

Page 12: ...AZEK Building Products 1330 W Fulton Market Suite 350 Chicago IL 60607 2019 AZEK Building Products All Rights Reserved TimberTech com ...

Reviews: