When installing the valve to pipes, do not allow any object, such as chips, to get inside a pipe or valve. Valve cannot fully 
closes, or the valve seat may get damaged causing fluid leakage, due to an foreign object jammed inside the valve. 

 

When piping, do not apply too much sealing material, such as solidifying liquid and tape, to the pipe connection sections so 
that these materials flow into the valve. Valve cannot fully closes, or the valve seat may get damaged causing fluid leakage, 
due to the sealing material jammed inside the valve. 

 

When connecting the valve to pipes, hold the valve body (where a pipe is screwed) with a tool such as a wrench, and screw 
the pipe into the valve. (See Fig. 5.)  Do not apply excessive torque to the pipe. Refer to the table in Fig. 5 for the 
recommended torque.  

 

 

 

 

 

 

 

 

 

Figure 5.  Valve connection to a pipe 

 

Before activating the ACTIVAL (valve with actuator), flush the pipes (with the ACTIVAL installed) at the maximum flow rate 
to remove all the foreign substances. Fully open (in 100 % position) the ACTIVAL to flush.   
(Factory preset position: Port A 100 %) 

 

Flow direction 

 

 

 

 

 

 

 

Figure 6.  Flow direction 

Identification of the ports A and B 

Valve body without heat insulation material wrapped: 

Identify the ports with the letters ‘A’ and ‘B’ embossed on the valve body. 

Valve body with the insulation material wrapped: 

Identify the ports with the tip of the valve joint surface, as shown in Fig. 7. 
The port on the side where the tip points is the port B. 

 

 

 

 

 

 

 

 

      Figure 7.  Identification of port A / B 

 

Heat insulation 

Do not apply heat insulation to the joint surface. Correctly apply heat insulation to the valve as shown in Fig. 8. 

 

 

 

 

 

 

Figure 8.  Heat insulation 

Factory preset position 

Port A of the ACTIVAL is set in 100 % (fully open) position for shipment.  

Torque 

Incorrect holding

position

Correct holding position

Recommended torque to screw into the pipe 

Valve size 

3/4” 

1” 

1

1

/

4

” 1

1

/

2

” 

Max. torque in-lbs 
(N

m) 

540 

(60) 

890 

(100) 

1070 

(120) 

1340 

(150) 

 

Mixing valve:

Port A/Port B 

 Port AB

Diverting valve: 

Port AB 

 Port A/Port B 

Joint surface

Tip of the  
joint surface 

Port B 

Port A 

Joint surface 

Heat insulation 
material 

Heat insulation 
material 

Joint 
surface 

Correct application                   Incorrect application

Summary of Contents for ACTIVAL VY5303B Series

Page 1: ...e can be installed in a restricted space such as inside of compact AHU Bronze valve body applicable to 230 psig Easy assembly with Model MY53X0A actuator using no tool and no adjustment required Linea...

Page 2: ...mosphere etc listed in the specifications Failure to do so might cause fire or device failure Use the product within its lifespan and avoid instrumentations that keep the product to operate excessivel...

Page 3: ...inal size Cv Close off rating Inch DN VY5303B0021 3 4 20 4 0 72 psig VY5303B0022 3 4 20 6 3 72 psig VY5303B0023 1 25 10 72 psig VY5303B0031 1 1 4 32 16 43 psig VY5303B 041 1 1 2 40 25 43 psig Mounting...

Page 4: ...he inflow side of each valve install it on the pipe diverting sections sections diverting from main piping system to sub piping system Install the valve so that the flow direction of process fluid agr...

Page 5: ...ces Fully open in 100 position the ACTIVAL to flush Factory preset position Port A 100 Flow direction Figure 6 Flow direction Identification of the ports A and B Valve body without heat insulation mat...

Page 6: ...the actuator onto the valve Mounting procedure 1 Manually turn the indicator manual lever of the actuator to 100 with the lever release button pressed Figure 10 Indicator manual lever at 100 fully ope...

Page 7: ...e Mixing application Figure 15 Application example Mixing valve Mounting Examples Diverting application Upright 90 tilted Figure 16 Mounting examples Diverting valve Mixing application Upright 90 tilt...

Page 8: ...operate smoothly valve stops halfway valve does not operate at all Conditions of the power applied and of the input signal applied to the actuator Wiring condition disconnected wires of the actuator F...

Reviews: