4-17
Step
Procedure
7
Install the pointer, secure the lock nut, and install the stem connector.
8
Install the rain cap on the air vent port.
9
Connect the air pipe to the air piping connection port of the bottom
diaphragm case.
10
After the assembly is complete as above, check the following.
1. Applying an air pressure of 490 kPa {5 kgf/cm} via the air piping
connection port of the bottom diaphragm case, check the diaphragm
periphery for air leak by using soapsuds.
2. Check that the actuator smoothly operates at its full stroke unit.
Note: Check this operation by operating the actuator as an independent.