background image

Assembling Process 

 

Step 1:   Connect the bottom tube with base by screwing them together. 

     

 

 

 

Step  2:  Feed  the  Power  Cord  through  the  Base  and  the  Bottom  Tube, 

and pull through around 1.8m of cable. 

 

Step  3:  Connect  two  middle  tubes  with  bottom  tube  by  screwing  them 

together.   

 

 

 

 

Step 4: Connect the top tube with middle tube by screwing them together.   

 

 

Step 5: Place the power cord plug through base, bottom pole, middle pole 

and  top  pole.  Connect  the  power  cord  plug  to  the  socket  in  the  heater 

head. 

 

Step 6: Push the Heater Head onto the Top Tube and fix in position using 

the 4x8mm screws. 

       

 

Step 7: Fix the power cord on the base by using Four M4 nuts. 

 

Reviews: