Refer elsewhere for corners, slopes and other
situations not illustrated here.
BRSCS SCREWS. install 4 screws into the top of each
post to secure the DRH under cap in position
AFGHR handrail to be snap fitted over Innerrail
AFGIR Innerrail
RETAINED GASKET to the outer face of glass,
either SRB for 6mm and 8mm glass, or SRE for
10mm and 12mm glass. Must be slid into post
prior to assembly.
TOUGHENED GLASS, of appropriate thickness,
depending on the post spacing. Refer to engineering
documents for all sizing and applications. Exposed
horizontal edges to be flat polished
WEDGE GASKET to the inner face of glass, either
SWE70 for 6mm glass, SWE50 for 8mm glass,
SWE55 for 10mm glass, or SWE35 for 12mm
glass.
AFG RECESSED POST.
On 90° corners use AFGEC & AFGIC
ABBAFG SETTING BLOCKS to back of glazing cavity.
AKS GLASS SEAT, to support glass. Attach to AIA
insert (press fit)
AIA INSERT for supporting glass by transferring
weight down to base plate or substrate.
CHEMSET Fixing - refer to engineering documents for
all sizing and applications
BPFGCF Baseplate (12mm Thick)
AFGI I N F I L L .
To snap into rear of post
Luna Installation Manual
Summary of Contents for Luna SD9 Series
Page 1: ......
Page 2: ...Luna Installation Manual ...