axing SZU 85-02 Mounting Instructions Download Page 3

State of the art 2021-01-12

 

Observe the safety instructions supplied with the device!
They are also available at the following Internet address:

https://download.axing.com/BAs/Sicherheitshinweise_9sprachig.pdf

 

Use the device only as described in these operating instructions and in 
particular in accordance with the state of the art. 
If the device is used for other purposes, no warranty will be assumed!

Technical improvements, changes in design, printing- and other errors reserved.

Manufacturer

AXING AG 

Gewerbehaus Moskau

 8262 Ramsen

EEA contact address

Bechler GmbH

Am Rebberg 44

 78239 Rielasingen

SZU 85-02/-06
Multifeed rail 

Mounting instructions

WEEE Nr. DE26869279 | Electrical and electronic components must not be 

disposed of as residual waste, it must be disposed of separately.

 

Under no circumstances may the antenna be installed under or in close 
proximity to overhead power lines! A minimum lateral distance of >1 m 
from any electrical equipment must be observed. Touching electrical 
installations may cause death!

 

Never work on antennas during thunderstorms or when a thunderstorm 
is approaching. There is a risk of death!

 

Never install antennas on buildings with inflammable roof coverings 
such as in thatched roofs! In such cases there is a fire hazard due to 
atmospheric surge voltages (static electricity) or lightning (e.g. during 
thunderstorms).

5

4

3

2

1

0

5

4

3

2

1

0

6

7

8

9

10

11

12

6

7

8

9

10

11

12

ASTRA 19,2°

HOTBIRD 13°

ASTRA 28,5°

Mounting for reception of   
ASTRA 19,2°, ASTRA 28,5 and Hotbird 13°

 

Bolt the multifeed rail to the antenna‘s support arm.

 

Clamp an LNB in each feed holder.

 

Lightly tighten the threaded bolts of the feed holders.

 

Slide the feed holders onto the multifeed rail in the positions shown 
above.

 

First fix the feed holder for the ‚ASTRA 19.2°‘ position on the rail (tighten 
threaded bolt).

 

Connect your measuring instrument to the ‚ASTRA 19.2°‘ LNB and align 
the entire antenna for optimized reception of ‚ASTRA 19.2°‘.

 

Tighten all installation screws of the antenna.

 

Now connect your measuring instrument to the ‚Hotbird 13°‘ LNB.

 

If required, optimize the ‚Hotbird 13°‘ reception by slightly moving the 
‚Hotbird 13°‘ feed holder on the multifeed rail.

 

Fix the LNB in the best position (tighten threaded bolt).

 

Now connect you measuring instrument to the ‚ASTRA 28,5°‘ LNB.

 

If required, optimize the ‚ASTRA 28,5°‘ reception by slightly moving the 
‚ASTRA 28,5°‘ feed holder on the multifeed rail.

 

Fix the LNB in the best position (tighten threaded bolt).

Reviews: