background image

 

MagIC X1000 DECT

 

 

Axalto – 2005 

 

EN 

Connecting the battery 

1 - 

Remove the battery cover at the back of the hand-held unit. 

2 - 

Plug the battery cable to the connector on the upper right-hand 

corner of the battery housing, taking care to the polarity. 

3 - 

Install the battery in its housing, then close the battery cover at 

the back of the hand-held unit. 

 

If you need to disconnect the battery, proceed as show on the 
illustration below. 

 

CAUTION:

 For a safe operation, the terminal must not be used 

without the battery cover. 

Connecting the power supply 

1

  - Insert the small plug of the power supply cable in the power 

connector at the back of the docking station. 

2

  - Plug the power supply into a standard wall socket with the 2 

(or 3)-pin plug located at the other end of the cable. 

3

  - Place the hand-held unit on the docking station and wait at 

least 3H for battery charging before first use. 

Note:

  The MagIC X1000 DECT has no On / Off switch. This 

function can be performed by connecting / disconnecting the 
transformer from the power source. 
 

It is recommended to place the hand-held unit on the 

docking station when it is not used. 

 

 

Connecting the modem  

1

  - Insert one end of the phone line cable into the connector 

labeled LINE at the back of the docking station. 

2

 - Connect the other end of the cable to a phone outlet. 

§ 

To connect a telephone to your MagIC X1000 DECT (if the 
option is available), insert the additional phone cable in the 
connector labeled PHONE at the back of the docking station. 
The telephone should then be able to operate through the 
terminal. 

Note:

 It is not recommended to use another system in parallel on 

the same telephone since this may cause terminal transmission 
errors during the processing centre call. 

 

 

Meaning of LEDs 

There are two leds on the docking station. 
They indicate the status of docking station. 

Left LED: 

- LED off: docking station is not OK or not supply. 
- LED on: docking station is OK. 
- LED flashing: docking station is OK and at least one hand-held 
unit is detected. 

Right LED: 

(Meaningful if docking station is OK and after 10 seconds) 
- LED off: no telephone line. 
- LED on: telephone line OK. 
- LED flashing: telephone line is engaged.

 

 

 

Installing the printer paper 

1 - 

Unlock the printer cover, and then rotate the cover to open it. 

2  - 

Place a roll of paper in its housing. Position the paper as 

shown on picture 2. 

Note: 

Use only the paper type recommended by the 

manufacturer. 

3  - 

Hold the extremity of the paper roll as shown on picture 3, 

keeping a few centimeters of paper out of the printer cover. The 
paper being in its proper place, close the printer cover. 

4 - 

Lock the printer cover. 

 

 

 
Note:  The tickets will not be printed if the printer cover is not 
correctly closed. 

Summary of Contents for MagIC X1000 DECT

Page 1: ...1 Installation Guide Guide d installation Guida per l installazione Gu a de instalaci n Point of Sales Terminals Terminaux de paiements Terminali di pagamento Terminales Punto de Venta GUI DECT EN FR...

Page 2: ...ile devono essere uniti Antes primero el uso carga la bater a para por lo menos 3H La base y el terminal deben asociarse para una carga correcta Content Contenu Contenuto Contenido Terminal handset Do...

Page 3: ...0 causes harm to the telephone network the Telephone Company may discontinue your service temporarily If possible they will notify you in advance But if advance notice isn t practical you will be noti...

Page 4: ...ro de s rie est plac sur l tiquette que vous pouvez trouver au dos du terminal Num ro de s rie du terminal ____________________________ Information consommateurs et exigences FCC Si vous rencontrez d...

Page 5: ...by an authorized maintenance operator Replacing the battery may be dangerous The non respect of this rule would invalidate the warranty Dispose of batteries according to the environmental protection r...

Page 6: ...g station 2 Connect the other end of the cable to a phone outlet To connect a telephone to your MagIC X1000 DECT if the option is available insert the additional phone cable in the connector labeled P...

Page 7: ...he European Council concerning pan European connection of terminal to the public telephone network PSTN However as there are differences between countries the PSTN approval in itself does not constitu...

Page 8: ...toris Le remplacement de la batterie peut tre dangereux Le non respect de cette r gle invaliderait la garantie du terminal Mettre les batteries au rebut selon la l gislation en vigueur dans votre pays...

Page 9: ...marche arr t Par cons quent pour d connecter le terminal il faut d brancher le bloc d alimentation de la prise secteur Il est recommand de toujours placer le terminal portable sur la station d accueil...

Page 10: ...r et le bas de l appareil S curit N ouvrez pas le terminal Contacter votre centre de maintenance si le message suivant appara t Key Corrupt ou Security Alter call Maintenance En cas de probl me En cas...

Page 11: ...ada pour les produits marqu s UL Nous Axalto 50 avenue Jean Jaur s 92542 MONTROUGE Cedex France d clarons que ce produit de la famille MagIC X1000 DECT sous r serve d installation entretien et utilisa...

Page 12: ...viene rispettata decade automaticamente la garanzia del terminale Provvedere allo smaltimento delle batterie secondo quanto previsto dalla normativa vigente Installazione delle schede SAM formato SIM...

Page 13: ...l altra estremit del cavo ad una presa telefonica Per collegare un telefono al vostro MagIC X1000 DECT se l opzione disponibile inserite il cavo telefonico supplementare nel connettore indicato con P...

Page 14: ...le rapide verifiche indicate in questo capitolo Sul display non appare nulla Verificate che il blocco d alimentazione sia ben collegato alla presa della rete elettrica e al terminale portatile o alla...

Page 15: ...DECT destinato ad interfunzionare con le seguenti reti Austria Francia Irlanda Svezia Belgio Germania Italia Svizzera Grecia Portogallo Regno Unito Lussemburgo Spagna e pu incontrare problemi di funz...

Page 16: ...r peligroso No respetar esta regla invalidar a la garant a terminal Desh gase de las bater as seg n las normas de protecci n ambiental y la legislaci n vigente en su pa s Instalaci n de tarjetas SAM t...

Page 17: ...r capaz de operar a trav s del terminal Nota No se recomienda utilizar otro sistema en paralelo en el mismo tel fono ya que esto puede causar errores de transmisi n en el terminal durante el procesami...

Page 18: ...ento Declaraciones de conformidad Conformidad EMV nivel 1 El terminal MagIC X1000 DECT ha obtenido la conformidad EMV nivel 1 Para comprobar que EMVCO a dado su aprobaci n a este terminal consultar la...

Page 19: ...eader SAM readers Lecteurs Lettori Lectores Max 3 SAM reader SIM format Communication Communication Communicazione Comunicaci n Module DECT Display Affichage Visualizzazione Pantalla Graphical 4 lines...

Page 20: ...ny time without notice Copyright 2004 Axalto Tous droits r serv s Ce document ne peut en tout ou partie tre reproduit par quelque proc d que ce soit copie physique ou lectronique sans l autorisation e...

Reviews: