AWG I Operating manual I Fittings I
Medium expansion foam nozzles M2, M4, M8
MAINTENANCE
38 / 40
ENGLISH
M1107B10 I Rev. 02-03/20
Replacing the pressure gauge
1. Use a spanner A/F
14 to unscrew the pressure gauge (Fig. 3/
3
)
from the nozzle body.
2. Clean the female thread on the nozzle body.
3. Position the new pressure gauge on the shut-off valve and carefully
tighten until you feel a slight increase in torque.
Any repair work on the AWG Foam nozzles may only be performed by
the AWG Fittings GmbH customer service or by an authorised special-
ist workshop.
If you need technical support, please contact our Service Centre:
AWG Fittings GmbH
Service Centre
D-89177 Ballendorf
Telephone: +49 (0) 73 40 / 91 88 98 880
Email: [email protected]
We will accept devices in need of repair or maintenance, discuss with
you the quickest and cheapest solution, create cost estimates, take
care of the execution of the repair work and are at your disposal for
any questions.
7.3 Disposal
Observe the local regulations regarding proper waste recycling or
disposal.
Materials
Foam tube, conversion screen: Stainless
steel
Nozzle body, stop valve:
Aluminium
Seals: NBR
Protection ring:
NBR