
AV-OL-KT-I2 - Obstruction Light Kit
Installation & Service Manual
Latest products and information available at
www.avlite.com
25
5. Install the MI
Mount the MI light directly to the top of the tower or installation structure either by securing
it to the mounting plate or by attaching an optional Avlite Right Angle Pole Mounting
Bracket (for medium intensity fixtures) to the tower and bolting the MI to the bracket.
6. Mount the top junction box.
Note:
Mounting hardware for junction boxes is not supplied.
7. Wire MI to top junction box
a. Wire MI power cable to junction box, then data cable to junction box.
Wiring instructions-Power Cable:
•
Connect the black positive conductor from the MI to the +48VDC labelled terminal in
the top junction box
•
Connect the white negative conductor from the MI to the -48VDC labelled terminal in
the top junction box