![AVK 641 Series Field Maintenance And Instruction Manual Download Page 16](http://html.mh-extra.com/html/avk/641-series/641-series_field-maintenance-and-instruction-manual_3032482016.webp)
page 15
REASSEMBLY AFTER INSPECTION:
All parts and sealing surfaces must be cleaned before reassembly. Worn parts and seals should be
replaced prior to reassembly..
2.
Put the higne stem in position, and tighten the set screw O-cord in the groove in the body if the O-cord
need
change.
3.
Pick up the cover on the body, put the bolts and washers on position, tighten the nut incrementally in a
crossover. Pattern to ensure that the cover doesn’t bend and o-cord is evenly compressed.
5.
If equipped any other stuff, also remount them.
4.
If equipped with a lever and weight assembly, remount weights if necessary. If equipped with a lever and
weight and guard assembly, remount weights if necessary and remount front part guard at last by tightening
bolts and nuts around guard.
1.
Put the whole disc inside the body, make sure the disc facing to a proper direction.