SET UP INSTRUCTIONS
THE SUPPLIED PACKAGING IS VITAL FOR PROTECTION AND SHIPPING.
IT SHOULD BE RETAINED AND REPLACEMENT PACKAGING IS COSTLY.
•
ON OPENING THE BOX AFTER REMOVING THE TOP
LAYER YOU WILL SEE THE TURNTABLE PARTS.
•
CAREFULLY REMOVE THE PARTS FROM THE
PACKAGING.
•
PLACE THE MOTOR WHERE IT IS TO BE PLAYED -
THIS SHOULD BE A FLAT LEVEL RIGID SURFACE.
•
MAKE SURE THE MOTOR POWER LEAD WILL REACH
THE MAINS SUPPLY.
•
THE ON/OFF SWITCH IS WITHIN THE LEAD.
•
NOW PLACE THE MAIN CHASSIS IN APPOXIMATELY
THE POSITION AS SHOWN IN THE IMAGE.
•
THIS DISTANCE BETWEEN THE SPINDLE AND
MOTOR CENTRE IS ABOUT 97MM (3.3/4”) BUT WILL
NEED AJUSTING TO ACHIEVE CORRECT SPEED.
•
LIFTING THE MAIN CHASSIS PLACE THE FEET
UNDERNEATH USING THE LOCATION POINTS.
•
YOU MUST CLEAN THE TOP OF THE BEARING
SPINDLE NOW AND ENSURE IT’S ALWAYS KEPT
CLEAN - INSERT SOFT TISSUE INTO TOP OF
SPINDLE AND TWIST TO CLEAN.
•
PLACE THE BEARING BALL INTO TOP OF SPINDLE.
DO NOT USE ADHESIVE OR ADD LUBRICATION TO
THIS AREA.
•
CAREFULLY FIT THE DRIVE HUB TO THE SPINDLE.
•
TAKE EXTREEME CARE NOT TO DROP THE HUB
ONTO THE SPINDLE OTHERWISE YOU WILL DAMAGE
THE SAPPHIRE BEARING.
NOW MANUALLY SPIN THE BEARING HUB TO MAKE
SURE IT ROTATES FREELY.
THE BEARING IS SELF LUBRICATING –
DO NOT ADD EXTRA LUBRICATION