A V G 9 Free © 2 0 1 0 C opyright A V G T ec hnologies C Z, s .r.o. A ll rights res erved.
9 2
Next, in the text field called
Name
there is the name assigned to this very schedule
by the program vendor (it is not possible to change this name).
Schedule running
Here, specify the time intervals for the newly scheduled program update launch. The
timing can only be done by defining an exact date and time (
Run at specific time
interval ...
).
Advanced schedule options
This section allows you to define under which conditions the program update should/
should not be launched if the computer is in low power mode or switched off
completely.
Other update settings
Check the
Run the update again after the Internet connection is available
option
to make sure than if the internet connection gets corrupted and the update process
fails, it will be launched again immediately after the internet connection is restored.