A V G 9 A nti V irus © 2 0 1 0 C opyright A V G T ec hnologies C Z, s .r.o. A ll rights res erved.
9 8
10.9.2. Virus Database Update Schedule
On the
Schedule settings
tab you can first check/uncheck the
Enable this task
item
to simply deactivate the scheduled virus database update temporarily, and switch it
on again as the need arises. The basic virus database update scheduling is covered
within the
Update Manager
component. Within this dialog you can set up some
detailed parameters of the virus database update schedule. In the text field called
Name
(
deactivated for all default schedules
) there is the name assigned to this very
schedule by the program vendor.
Schedule running
In this section, specify the time intervals for the newly scheduled virus database
update launch. The timing can either be defined by the repeated update launch after a
certain period of time (
Run every ...
) or by defining an exact date and time (
Run at
specific time ...
).
Advanced schedule options
This section allows you to define under which conditions the virus database update