Avaya XBU48 Installation And Operator'S Manual Download Page 9

INSTALLATION

Avaya

t

XBU48 Site Preparation, Installation and Operator’s Manual

S

700071244 Issue 3

5

Installing the XBU48

The following instructions assume you have already removed the
XBU48s from the pallets according to the unloading instructions on the
outside of the shipping box.

To install the XBU48:

1.

Place the XBU48 near the operating site. The UPS should be well
ventilated and away from direct sunlight or other heat source.

NOTE

It is recommended to allow a minimum of 4.5” of space from the rear of the cabinet

for proper ventilation.

2.

If you are using only one XBU48 and want increased stability or a
seismic installation, remove the mounting plates from the pallet
(see Figure 1). Otherwise, skip to Step 6.

5/16” Bolts

Mounting Plates

Figure 1. Seismic Installation Mounting Plates

Summary of Contents for XBU48

Page 1: ...Site Preparation Installation and Operator s Manual for 48 Vdc Extended Battery Cabinet XBU48 for use with Series 1 1500 2000 VA Uninterruptible Power Systems www powerware com avaya...

Page 2: ...e at his own expense ICES 003 This Class A Interference Causing Equipment meets all requirements of the Canadian Interference Causing Equipment Regulations ICES 003 Cet appareil num rique de la classe...

Page 3: ...Contents 1 Introduction 1 UPS Model and Battery Configurations 1 XBU48 System Recharge Time 1 XBU48 Battery Times 2 2 Installation 3 Safety Warnings 3 Installing the XBU48 5 Important Safeguards 10 XB...

Page 4: ...TABLE OF CONTENTS Avayat XBU48 Site Preparation Installation and Operator s Manual S 700071244 Issue 3 ii...

Page 5: ...model and battery configuration for your equipment 1 Load requirements of the equipment you want to protect Select the UPS model that meets the power consumption requirements of the equipment you want...

Page 6: ...VA 1400 VA 1200 VA 1000 VA 800 VA 650 VA 3 5 1 1 1 1 1 1 1 1 1 4 0 2 1 1 1 1 1 1 1 1 4 5 2 2 1 1 1 1 1 1 1 5 0 2 2 2 1 1 1 1 1 1 5 5 2 2 2 2 1 1 1 1 1 6 0 2 2 2 2 2 1 1 1 1 6 5 2 2 2 2 2 1 1 1 1 7 0 2...

Page 7: ...he UPS and batteries Please read all instructions before operating the equipment and save this manual for future reference DANGER Risk of electrical shock Installation of battery cabinets must be done...

Page 8: ...hock or burn from high short circuit current The following precautions should be observed 1 Remove watches rings or other metal objects 2 Use tools with insulated handles 3 Do not lay tools or metal p...

Page 9: ...l the XBU48 1 Place the XBU48 near the operating site The UPS should be well ventilated and away from direct sunlight or other heat source NOTE It is recommended to allow a minimum of 4 5 of space fro...

Page 10: ...Refer to your local building codes for seismic mounting requirements 13 50 Minimum from Wall 8 50 7 50 TYP 0 44 1 563 13 00 13 00 0 375 Mounting Holes 7 60 from Front of Units Front of Unit Figure 2...

Page 11: ...8 Align the L shaped mounting bracket with the two holes closest to the rear of the XBU48 and secure using two of the countersink screws from the start up kit NOTE The vertical section of the L bracke...

Page 12: ...first cabinet Follow this procedure for each additional XBU48 13 Plug the detachable power cord into the charger AC input receptacle 14 Plug the other end of the power supply cord into a grounded thr...

Page 13: ...and Operator s Manual S 700071244 Issue 3 9 Battery Circuit Breaker Battery Connector Battery Output Cord Unit Rating Label Charger Charger Air Exhaust Charger AC Input Receptacle Breaker Tie Alarm Co...

Page 14: ...witch the circuit breaker to the ON position on each XBU48 18 The UPS may now be turned on according to your Avaya UPS operator s manual Important Safeguards S Do not connect or disconnect XBU48s whil...

Page 15: ...vided on the rear panel of the XBU48 The contacts will close if there is an overload or overtemperature condition Optional To use the alarm contacts connect alarm leads to the two contacts on the alar...

Page 16: ...lected IEC 320 C13 input connector Circuit Protection Circuit breaker protection Alarm Contact 1A 30 Vac or 1A 60 Vdc Dimensions WxDxH 17 2 x 24 6 x 28 3 43 7 x 62 5 x 71 9 cm Weight Shipping weight 7...

Page 17: ...24 hours then retest Protected equipment power requirements exceed UPS capacity Reduce load then retest Charger LED is not on XBU48 connections are not secure Verify that the XBU48 is plugged in and t...

Page 18: ...rmal operations If you have any questions or problems with your UPS call your Avaya service representative or the appropriate telephone number on the service label of your UPS Please have the followin...

Page 19: ......

Page 20: ...164201322C 164201322 C...

Reviews: