Introduction
1-7
VSU-7500 User Guide
Required Equipment
The VSU-7500 shipping carton should contain:
To install and use the VSU-7500 in a typical network, the customer must supply:
•
Router providing connectivity to a WAN such as the Internet
•
10/100BASE-T Ethernet hub, router, or switch providing connectivity to a
LAN
•
CAT 3, 4, or 5 UTP cable to interconnect router, VSU-7500, and hub(s)
•
An asynchronous ASCII terminal supporting RS-232 or a PC running
terminal emulation software to provide initial IP configuration (IP address,
subnet mask, default router)
•
PC workstation to run VPNmanager network management application
Configuring Equipment Racks
The VSU-7500 can be placed on a desktop or shelf or mounted in a standard
19-inch equipment rack. The location of the chassis and the layout of your
equipment rack or wiring room are extremely important for proper system
operation. Equipment placed too close together, inadequate ventilation, and
inaccessible panels can cause system malfunctions and shutdowns, and can make
system maintenance difficult.
Quantity
Part Description
1
VSU-7500 VPN Service Unit
1
VSU-7500 VPN Service Unit User Guide
2
Redundant power supply modules
1
UTP Crossover Cable (for connection to a router, switch, or hub)
1
Null Modem Cable (for connection to the VSU Console port)
2
Power cord (110V) or Power cord (230V)
1
Rack mount kit including two mounting brackets and screws for
attaching the brackets to the VSU-7500. Hardware required to mount
the unit to the rack must be provided by the customer.
4
Rubber feet for desktop installations
Summary of Contents for VSU 7500
Page 1: ...VSU 7500 VPNware Service Unit User Guide VPNet Technologies Inc ...
Page 19: ...Installing the VSU 7500 2 3 VSU 7500 User Guide Figure 2 2 Installing the Rackmount Brackets ...
Page 40: ...A 4 Specifications VSU 7500 User Guide ...
Page 42: ...B 2 10 100BASE T UTP Crossover Cable Pinouts VSU 7500 User Guide ...