![AVANT A21000 Operator'S Manual For Attachment Download Page 20](http://html1.mh-extra.com/html/avant/a21000/a21000_operators-manual-for-attachment_3024988020.webp)
20 (26)
1
Drive slowly, using moderate
to high engine rpm.
Once the tip of the bucket is
in the pile, begin to tilt the
bucket.
2
Scoop the bucket full by
simultaneous driving forward,
tilting, and lifting the bucket.
3
Once the bucket is almost full,
lift the bucket with loader
boom.
Keep driving slowly forward.