40
Index
Travis Industries
4 1 2 2 1 0 4
9 3 5 0 8 1 1 7
Adjusting the Blower Speed........................24
Adjusting the Flame Height .........................23
AFUE.........................................................5
Air Shutter Adjustment................................17
Alcoves (see “Heater Placement Req.”) .......7
Altitude Considerations...............................8
Amperage (of blower)..................................5
Blower Speed ............................................24
BTU Output................................................5
Burn Rate...................................................5
Burner Installation .......................................31
Cap (vent termination) .................................16
Cleaning Your Heater ..................................25
Clearances .................................................6
Condensation ............................................23
Controls .....................................................21
Dimensions ................................................5
Door Opening ............................................19
Efficiency ...................................................5
Elbows.......................................................9
Electrical Specifications...............................5
Emissions ..................................................5
Flame Height ..............................................18
Floor Protection Requirements....................7
Fuel ...........................................................5
Fumes ..................................See Inst. On Cover
Gas Control Valve (Location)........................21
Gas Inlet Installation ....................................7
Gas Leak ...............................See Inst. on Cover
Gas Line Connection ..................................7
Gas Smell ..............................See Inst. on Cover
Heating Capacity.........................................5
High Wind Vertical Terminations...................8
Horizontal Vent Termination Requirements ..16
How to Measure Vent Lengths ....................9
Installation Options .....................................5
Installation Preparation ................................6
Leaking Gas .......................See Inst. on Cover
Lifting Flames .............................................18
Listing Label (Safety Label) .........................29
Log Installation ...........................................20
Maintaining Your Stove’s Appearance ..........25
Natural Gas Verses Propane ........................2
On/Off Operation........................................23
On/Off Switch (Location) .............................21
Operating Sounds ......................................2
Order of Installation .....................................6
Packing Lists ..............................................6
Paint Curing ...............................................23
Pilot (starting) .............................................22
Pilot Flame (Location)..................................21
Pressure (of gas) ........................................7
Purging Gas Line (with door open) ...............17
Restrictor Adjustment .................................9
Safety Label ...............................................29
Safety Precautions .....................................2
Silicone Vent Sections................................8
Snorkel Terminations ..................................8
Sounds......................................................24
Starting The Pilot Flame ..............................22
Starting the Heater for the First Time ............23
Stove Placement Requirements ..................7
Table of Contents .......................................4
Troubleshooting Table................................26
Vent Configurations....................................9
Vent Part #’s...............................................8
Vent Requirements ....................................8
Vertical Vent Termination Requirements ......16
Warranty.....................................................30
Water (on glass - see starting the heater) ......23
Wiring Diagram............................................28
Yearly Service Procedure ............................25
Summary of Contents for 93508117
Page 2: ......