18
The minimum clearance between the air conditioner and the combustibles is 1.5
m.
The power cable enables communication between the indoor and outdoor units.
You must first choose the right cable size before preparing it for connection.
Grounding Requirements
The air conditioner is the type I electrical appliance and must ensure a reliable
grounding.
Do not connect the grounding wire to a gas pipe, water pipe, lightning rod,
telephone line, or a circuit poorly grounded to the earth.
The grounding wire is specially designed and shall not be used for other purpose,
nor shall it be fastened with a common tapping screw.
Others
The connection method of the air conditioner and the power cord and the
interconnection method of each independent element shall be subject to the
wiring diagram affixed to the machine.
The model and rating value of the fuse shall be subject to the silkscreen on
corresponding controller or fuse sleeve.
7-2 Installation of Indoor Unit
9
Installation Parts-checking
Packing list of the indoor unit
NO.
Name
Quantity
Unit
1
Indoor Unit
1
Set
2
Remote Controller
1
PC
3
Batteries(7#)
2
PC
4
Instructions
1
Set
5
Drain pipe
1
PC
NOTE:
※
All accessories shall be subject to actual packaging material, and if there is any
difference, please understand.
10
Selection of Installation location
Summary of Contents for ASW-H09B5B4/FAR3DI-C3
Page 1: ...AUX Imp Exp Company Limited F Freedom Inverter Split Type Air Conditioner ...
Page 2: ...This manual is for professional maintenance personnel only ...
Page 7: ...4 2 2 Outdoor Unit 1 3P 1 8P 新 2P 2 3P ...
Page 17: ...14 5 Electrical Part 5 1 Wiring Diagram Indoor Unit 09K 12K 18K 24K Outdoor Unit 09K 12K ...
Page 18: ...15 18K 24K ...
Page 19: ...16 Part II Installation and Maintenance 6 Main Tools for Installation and Maintenance ...
Page 71: ...68 Remote Control Can Not Work Trouble shooting procedure ...
Page 72: ...69 9 Exploded Views and Parts List 9 1 Indoor Unit ...
Page 74: ...71 9 2 Outdoor Unit ...
Page 77: ...74 3 Remove air louver 4 Remove air filter 5 Remove Medium frame wiring cover ...
Page 78: ...75 6 Remove medium frame 7 Remove Control the lid 8 Remove Electric box ...
Page 79: ...76 9 Remove press plate 10 Remove component 11 Remove pipe clamp ...
Page 80: ...77 12 Remove evaporator 13 Remove the blade 14 Remove Motor press plate ...
Page 81: ...78 15 Remove Motor 10 2 Outdoor Unit Part Procedure Diagram 1 Outdoor unit ...
Page 82: ...79 2 Remove top cover 3 Remove control box cover ...
Page 83: ...80 4 Remove panel grille 5 Remove front panel ...
Page 84: ...81 6 Remove E part cover 7 Remove right side panel ...
Page 85: ...82 8 Remove axial flow blade 9 Remove outer motor ...
Page 86: ...83 10 Remove electric box assy 11 Remove motor support ...
Page 87: ...84 12 Remove reactor 13 Remove partition board ...
Page 88: ...85 14 Remove left side support plate 15 Remove pipeline assembly ...
Page 89: ...86 16 Remove stop valve assembly 17 Remove valve plate ...