17
7. Installation
7-1 Notes for Installation
Important Notices
Before installation, please contact with local authorized maintenance center, if
unit is not installed by the authorized maintenance center, the malfunction may
not solved, due to discommodious contact.
The air conditioner must be installed by professionals according to the national
wiring rules and this manual.
To move and install air conditioner to another place, please contact our local
special service center.
Requirements For Installation Position
Avoid places of inflammable or explosive gas leakage or where there are strongly
aggressive gases.
Avoid places subject to strong artificial electric/magnetic fields.
Avoid places subject to noise and resonance.
Avoid severe natural conditions (e.g. heavy lampblack, strong sandy wind, direct
sunshine or high temperature heat sources).
Avoid places within the reach of children.
Shorten the connection between the indoor and outdoor units.
Select where it is easy to perform service and repair and where the ventilation
good.
The outdoor unit shall not be installed in any way that could occupy an aisle,
stairway, exit, fire escape, catwalk or any other public area.
The outdoor unit shall be installed as far as possible from the doors and windows
of the neighbors as well as the green plants.
Requirements for operations at raised height
When carrying out installation at 2m or higher above the base level, safety belts
must be worn and ropes of sufficient strength be securely fasten to the outdoor
unit, to prevent falling that could cause personal injury or death as well as
property loss.
Requirements of the mounting structure
The mounting rack must meet the relevant national or industrial standards in
terms of strength with welding and connection areas rustproofed.
The mounting rack and its load carry surface shall be able to withstand 4 times or
above the weight of the unit, or 200kg, whichever is heavier.
The mounting rack of the outdoor unit shall be fastened with expansion bolt.
Ensure the secure installation regardless of what type of wall on which it is
installed, to prevent potential dropping that could hurt people.
Electrical Safety Requirements
Be sure to use the rated voltage and air conditioners dedicated circuit for the
power supply, and the power cord diameter must meet the national requirements.
Be sure to use the rated voltage and air conditioners dedicated
When the maximum current of air conditioner is ≥16A, it must use the air switch
or leakage protection switch equipped with protection devices.
The normal operating range is 90%-110% of the local rated voltage.
Summary of Contents for ASW-H09B5B4/FAR3DI-C3
Page 1: ...AUX Imp Exp Company Limited F Freedom Inverter Split Type Air Conditioner ...
Page 2: ...This manual is for professional maintenance personnel only ...
Page 7: ...4 2 2 Outdoor Unit 1 3P 1 8P 新 2P 2 3P ...
Page 17: ...14 5 Electrical Part 5 1 Wiring Diagram Indoor Unit 09K 12K 18K 24K Outdoor Unit 09K 12K ...
Page 18: ...15 18K 24K ...
Page 19: ...16 Part II Installation and Maintenance 6 Main Tools for Installation and Maintenance ...
Page 71: ...68 Remote Control Can Not Work Trouble shooting procedure ...
Page 72: ...69 9 Exploded Views and Parts List 9 1 Indoor Unit ...
Page 74: ...71 9 2 Outdoor Unit ...
Page 77: ...74 3 Remove air louver 4 Remove air filter 5 Remove Medium frame wiring cover ...
Page 78: ...75 6 Remove medium frame 7 Remove Control the lid 8 Remove Electric box ...
Page 79: ...76 9 Remove press plate 10 Remove component 11 Remove pipe clamp ...
Page 80: ...77 12 Remove evaporator 13 Remove the blade 14 Remove Motor press plate ...
Page 81: ...78 15 Remove Motor 10 2 Outdoor Unit Part Procedure Diagram 1 Outdoor unit ...
Page 82: ...79 2 Remove top cover 3 Remove control box cover ...
Page 83: ...80 4 Remove panel grille 5 Remove front panel ...
Page 84: ...81 6 Remove E part cover 7 Remove right side panel ...
Page 85: ...82 8 Remove axial flow blade 9 Remove outer motor ...
Page 86: ...83 10 Remove electric box assy 11 Remove motor support ...
Page 87: ...84 12 Remove reactor 13 Remove partition board ...
Page 88: ...85 14 Remove left side support plate 15 Remove pipeline assembly ...
Page 89: ...86 16 Remove stop valve assembly 17 Remove valve plate ...