Installation & Commissioning Handbook, ,
P-ASENSE75/IE 980302, 7483 Trondheim
Page 2
4. Commissioning the system ............................................15
4.1 Responsibility for commissioning the system .................................... 15
4.2 Pre-commissioning check-list............................................................. 15
4.3 Setting addresses - analogue addressable system ............................... 16
4.4 Setting switches for monitoring the air flow ...................................... 16
4.5 Power supply ...................................................................................... 17
4.6 Configuration of air-flow monitoring................................................. 18
4.7 Final installation tasks ........................................................................ 19
5. Final testing .....................................................................20
5.1 Alarm test / testing of smoke transport time and symmetry............... 20
5.2 Testing of air-flow monitoring ........................................................... 20
5.2.1 Introduction ........................................................................... 20
5.2.2 Simulated break in a pipe ...................................................... 20
5.2.3 Simulated blockage in a pipe................................................. 20
5.3 Fire simulation test ............................................................................. 21
6. Service and maintenance................................................22
6.1 Annual service .................................................................................... 22
6.2 Service check-list................................................................................ 22
6.3 Changing the filter .............................................................................. 23
7. Appendix ..........................................................................24
7.1 Terminal strip 2 .................................................................................. 24
7.1.1 Internal connection for 2 loops - conventional version......... 24
7.1.2 Internal connection of detector loop - analogue
addressable system ......................................................................... 25
8. Reader’s Comments ........................................................27