Commissioning the system
Installation & Commissioning Handbook, ,
P-ASENSE75/IE 980302, 7483 Trondheim
Page 19
4.7 Final installation tasks
•
Replace the top cover.
IMPORTANT: Ensure that the top cover is replaced correctly to
avoid “false” air entering the detector.
•
Tighten up the 6 screws.