
46
7.1.1 Twin Alternating Control Set-Up
Task
962M Main Control Position
Tank 1
962S Secondary Control
Position
Tank 2
1. Open manual bypass valve
2. Close manual inlet and outlet valves
3. Mount 962M main and 962S
secondary controls [962M and 962S
controls must be in the midpoint of the
SERVICE position before inserting
camshaft]
SERVICE
SERVICE
4. Connect 12VAC power supply to 962M
control
SERVICE
SERVICE
5. Program the 962M main control. (See
Table IIC for programming parameters.)
[LED will show ERR4 message
indicating controls require
programming]
SERVICE
SERVICE
6. Exit programming mode. Depress up
and down buttons for 3 seconds or
wait 30 seconds
SERVICE
SERVICE
7. Disconnect 12VAC power supply from
962M control
SERVICE
SERVICE
8. Manually rotate camshafts to REFILL
REFILL
REFILL
9. Connect external cam switches
REFILL
REFILL
10. Connect 962M main and 962S
secondary controls with
factory-installed 4-pin connector.
REFILL
REFILL
11. Reconnect 12VAC power supply and
optional battery backup to the 962M
REFILL
REFILL
12. Observe controls for proper operation.
[Tank 1 control will rotate to the
STANDBY
position followed by Tank 2]
STANDBY
REFILL
13. Observe controls for proper operation.
[962M will remain in
STANDBY
. 962S
will rotate to
SERVICE
]
STANDBY
SERVICE
14. System is now ready for operation
STANDBY
SERVICE
When connecting the optional battery backup,
the black wire should be connected first!
Connecting the red wire first could result in serious
damage to the circuit board.
Important:
Con-
Summary of Contents for Magnum Cv 942
Page 1: ...Installation and Service Manual Magnum Cv and Magnum IT Valves...
Page 2: ......
Page 53: ...49 Figure 7 3 Magnum IT Triple Parallel Configuration...
Page 59: ...55 10 0 Performance Data and Charts 10 1 Magnum Injector Data...
Page 60: ...56 Brine draw and Rinse rates on empty tank...
Page 67: ...63 11 4 Triple Parallel Wiring Model 962 Twin or Triple Parallel Wiring Schematic...
Page 68: ...64 11 5 Model 962 Twin Alternating System Main Secondary Wiring Schematic...