Autometers Systems IC 970 Installation & Operating Manual Download Page 11

21

20

Current Transformer  Selec tion

For accurate monitoring, correct selection of current transformers are critical. The following 
paragraphs provide the information required to choose these transformers.

The 900 range of meters use current transformers (C T ) to sense the current in each phase of the 
power feed. The selection of the C Ts is impor tant because it direc

tly affects accurac y.

The C T secondar y rating depends on the current input option installed. The standard IC 900 
current rating is 5 amps.

The C T primar y rating is normally selected to be equal to the current rating of the power feed 
protection device. However, if the peak anticipated load is much less than the rated system 
capacity then improved accurac y and resolution can be obtained by selecting a lower rated C T. 
I n this case the C T size should be the maximum expected peak c25%, rounded up to the 
nearest standard C T size.

O ther factors may affect C T accurac y. The length of the C T cabling should be minimised.
Also the C T burden rating must exceed the combined burden of the IC 900, plus cabling, 
together with any other connected devices.

O verall accurac y is dependent on the combined accuracies of the IC 900 ME TER and 
the current transformers.

Measurements

The unit is designed for measuring 3 phase in a 4 wire star configuration. 

Technical Parameters

Meter standard 

BS EN 61036

Accurac y 

Active 1.0, reactive 2.0

Reference Voltage 

3 x 230/400 volt

Basic Current 

5 amp

Maximum Current 

6 amp

Frequenc y 

50/60 H z

Pulse Constant 

5000 imp/kWh, 

 

5000 imp/kVarh 

Outputs

There are two optically isolated volt free relays on the IC 970.

Pulse duration: Programmable.  

Pulse Value: Programmable.

Default 100 ms 

 

 

Default 1 kWh, 1 kVah

Relay contacts maximum switching voltage  230 volt 100 Ma
Maximum switching current 0.75 Amp (switching power 30 va)

Communication Module

Fully programmable 485 Modbus Default. 
Baud Rate: 

9600

Wire Mode: 

2 WIRE

Modbus Type: 

R TU

Measurement Categor y CATIII

Measurement categor y III is for measurements per formed in the building installation. Note 2 
examples are measurements on distribution boards, circuit breakers, wiring, including cables, 
bus-bars, junction boxes socket- outlets in the fixed installation, and equipment for industrial use 
and some other equipment, for example, stationar y motors with permanent connection to the 
fixed installation.

        Double Insulation Symbol

Table 1 symbol 11, IEC 60417-5172
Defined as: I nsulation comprising both basic insulation and supplementar y insulation.

Range of voltage 

200v – 250 v

Operation temperature  - 10ºC + 50ºC
Storage temperature 

- 10ºC + 60ºC

Humidity <=95%
Power consumption 

0.01VA @5A; 1.5W

 

10VA @230 volt

Pulse output 

BS EN 62053 -31 

Parity Type: 

EVEN

Data Format: 

FLOATING POINT

FP. Format: 

HIGH WORD  1st

!

Caution, risk of elec tric shock

Transformer selection

Performance and data

Definitions

Summary of Contents for IC 970

Page 1: ...of data collection units this enabling complete measurement and data collection systems to be built up A new feature to the IC 970 is the protocol set up information which can be viewed on the displa...

Page 2: ......

Page 3: ...e current transformer ratio If you want to monitor the neutral current then the neutral current transformer ratio will also need to be programmed If the meter has been purchased with the communication...

Page 4: ...ay will change to You will notice the cursor is ashing at the rst digit on the left of the two digits Press the key with 1 on it the cursor will now move to the next digit now press 3 3 Press Enter Th...

Page 5: ...lay 8 Please follow these instructions precisely 1 Press Function Key The display will change to You will notice the cursor is ashing at the rst digit on the left of the two digits Press the key with...

Page 6: ...ate meter readings Press Enter The meter will automatically take you back to the default display 10 Please follow these instructions precisely 1 Press Function Key The display will change to You will...

Page 7: ...position Press Enter The meter will automatically take you back to the default display 12 Please follow these instructions precisely 1 Press Function Key The display will change to You will notice th...

Page 8: ...ow the meter has been programmed The Function Key to select special functions Display of 4 lines with 20 characters per line Membrane Keypad with 15 sealed keys To View Minimum and Maximum Values Pres...

Page 9: ...correct protocol in the meter See below You will notice two red binary switches next to each other one is marked ADDR and the other switch is marked FUNC The binary switch has 8 switches numbered 1 8...

Page 10: ......

Page 11: ...tion Technical Parameters Meter standard BS EN 61036 Accuracy Active 1 0 reactive 2 0 Reference Voltage 3 x 230 400 volt Basic Current 5 amp Maximum Current 6 amp Frequency 50 60 Hz Pulse Constant 500...

Page 12: ...0 246 0 223 0 189 0 105 0 069 0 102 0 068 0 048 0 055 0 046 Customer care is the cornerstone of the company s success A positive service policy is observed throughout every specialist area of operatio...

Reviews: