Step 5:
Put the 3 wires (red, black, blue) through the tower. Install the
turbine to your chosen tower securely and fasten the bolts by using the
hex key no.5.
Rubber spacer should be attached to the tower to increase secure
connection to the Yaw Shaft. The outside diameter of the iron pipe should
be 48.3 mm, the thickness of iron pipe should be 1.9 mm at least.
Caution:
Ensure that rubber spacer is attached to the tower pole prior
to turbine installation, otherwise the turbine will be too loose and unable
to sustain vibrations. Any product damage caused by operations without
rubber spacer is not covered under the warranty.