Test Equipment
Remove Cover
Drill 13mm hole through circle on decal at the opposite end from the cord.
Insert supplied grommet (zip tied to black and white wires) into hole. Route
new cord through grommet. Connect hot wire
(220 VAC hot or 110 VAC
Phase 1)
from new cord to black wire inside unit, connect
(neutral or 110
VAC Phase 2)
wire from new cord to white wire inside unit. Connect wires
with appropriate size wire nuts and tape, connect ground to transformer
mounting stud.
NOTE: Wiring in a cord for a 2nd unit must be performed by a
qualified electrician.
OPTIONAL ADD ON CORD FOR 2nd and 3rd UNITS
ADD ON CORD INSTRUCTIONS
12
Learn more about battery chargers and jump starters we have.