NOTE: If PROG LINKS is not used, it is possible to use completely different program
sources in zones 1-8 to zones 9-16.
NOTE: Maximum prog link cable length is 0.5m
17
INSTALLATION SERIES
Australian Monitor
PROG LINKS
Program sources can be sent to the slave DigiPageJr by connecting the PROG LINKS OUTPUT
on the Master unit to the PROG LINKS INPUT on the Slave unit. This simplifies connection of
sources as all 4 sources can be sent from the master to the slave via 1 CAT5 cable avoiding
the need for Y-cables
The PROG TRIM on the slave unit operates independently of the master unit. The PROG TRIM
on the slave unit should be set to the same position as on the master.
Use a pre-wired CAT5 patch lead. The maximum cable length for the program source link
cable is 0.5m. However this cable should be kept as short as possible because it is carrying
audio signal.
PRIORITY PAGING STATION
If a priority paging station is being used in a linked 16 zone system it must be connected to
CAT5 RUN 1 of the master unit.