4
ALC UIM Panel Lif
ter_19
Australian Lifting Centre
USER INS
TRUCTION MANU
AL
RING P
ANEL LIFTER
14
1102, 14
1105, 14
1110
DEMOULD THE RECESS FORMER
To demould the recess former, insert two rods into
the holes and levered out with a scissor action. This
procedure can avoid damage to the recess former.
Attempting to remove the recess former using the
tip of a carpenter’s hammer will destroy it.
LOCKING THE PANEL LIFTER
The ring panel lifter is positively locked by a simple
hand-operated movement of the locking bolt
resulting in a safe connection of the ring panel lifter
to be able to move in any direction. The precast panel
can now be lifted out of the mould for transporting.
FITTING THE PANEL LIFTER
To transport the concrete panel, an appropriate ring
panel lifter should be inserted over the anchor head
which is in the concrete recess. The load ranges are
designed to mismatch-proof.
RELEASE THE PANEL LIFTER
The ring panel lifter can be released manually by pushing
back the locking bolt once the device is off-load.
USING THE PANEL LIFTER
The ring panel lifter is used for all load directions.
Maximum load of anchor and ring panel lifter must
be considered. Angle pull caused by spreaded chain
suspension is limited by a maximal 60°.
≤60°
≤60°
≤90°
≤90°
≥90°