3.1 Installing the suspension bracket
•
The bracket must be structurally secured within the roof as
shown in the diagram
!
•
The largest cylinder must project down from the ceiling by at
least 150mm (BCA requirement) unless the ceiling is made
from a non-combustible material such as concrete.
!
•
You must leave a 25mm clearance gap between the bracket
and the ceiling. This gap will be covered by the ceiling
Flange.
!
•
12mm ventilation gap between the ceiling and the ceiling
flange
!
•
25mm minimum clearance from the triple skin flue to any
combustible material within the roof space
!
•
50mm minimum overlap of the stainless steel 6” flue into the
connector
•
Engage smallest diameter of the triple skinned flue, minimum
50mm into the connector in the lower active flue.
!
3. INSTALLATION