Aurora THE HEARTH Installation And User Manual Download Page 1

!

AURORA WOODFIRES INSTALLATION AND USER MANUAL                             +61 266 874880 PO 347 BOX BYRON BAY    NSW 2481 

THE HEARTH

 

INSTALLATION AND USER MANUAL

Summary of Contents for THE HEARTH

Page 1: ...AURORA WOODFIRES INSTALLATION AND USER MANUAL 61 266 874880 PO 347 BOX BYRON BAY NSW 2481 THE HEARTH INSTALLATION AND USER MANUAL...

Page 2: ...RES INSTALLATION AND USER MANUAL 61 266 874880 PO 347 BOX BYRON BAY NSW 2481 CONTENTS PLANNING 1 DIMENSIONS SPECIFICATIONS 2 INSTALLATION 3 USING THE HEARTH 4 TESTING 5 KEEP THESE INSTRUCTIONS FOR FUT...

Page 3: ...floor has adequate protection CAUTION MIXING OF APPLIANCE OR FLUE SYSTEM COMPONENTS FROM DIFFERENT SOURCES OR MODIFYING THE DIMENSIONAL SPECIFICATION OF COMPONENTS MAY RESULT IN HAZARDOUS CONDITIONS...

Page 4: ...Rotating 1200mm A combustible surface is anything that can burn i e plaster wall paper wood fabrics etc These surfaces are not limited to those that are visible and also include materials that are beh...

Page 5: ...per Material 4mm Steel Finish high temperature coating system Resistant to 650 degrees MATTE BLACK A range of other colours are available on request For more information visit our website www aurorawo...

Page 6: ...combustible material such as concrete You must leave a 25mm clearance gap between the bracket and the ceiling This gap will be covered by the ceiling Flange 12mm ventilation gap between the ceiling a...

Page 7: ...AURORA WOODFIRES INSTALLATION AND USER MANUAL 61 266 874880 PO 347 BOX BYRON BAY NSW 2481 PITCHED ROOF INSTALLATION Custom Made Bracket 3 INSTALLATION CONTINUED...

Page 8: ...nto it 2 Ensure the triple skin flue is installed as per Australian standards see diagrams below 3 INSTALLATION CONTINUED PITCHED ROOF INSTALLATION The top of the flue must be 60cm higher than the hig...

Page 9: ...bove the roofline Alternatively there must be a minimum distance of 8 meters from any higher section of roof FLAT ROOF INSTALLATION LESS THAN 5 PITCH 60cm 60cm 1m 5m 3 INSTALLATION CONTINUED The minim...

Page 10: ...BAY NSW 2481 FLAT ROOF INSTALLATION 3 3 Assembling the external flue IMPORTANT CRIMPS MALE ENDS ON STAINLESS STEEL PIPES TO POINT DOWN INTO THE HEATER POP RIVET ALL JOINTS WITH 1 8 MONEL RIVETS IMPORT...

Page 11: ...AY NSW 2481 3 INSTALLATION CONTINUED PITCHED ROOF INSTALLATION 3 3 Assembling the external flue IMPORTANT CRIMPS MALE ENDS ON STAINLESS STEEL PIPES TO POINT DOWN INTO THE HEATER POP RIVET ALL JOINTS W...

Page 12: ...BOX BYRON BAY NSW 2481 3 3 Installing the internal flue Position the single skin flue inside the suspension bracket and tighten the grub screws Use a level to ensure that the flue is perfectly vertica...

Page 13: ...earing 5 Tighten the first 16mm nut If necessary back the nut o slightly until the firebox rotates freely 6 Tighten the second 16mm nut against the first 7 Insert the split pin 3 INSTALLATION CONTINUE...

Page 14: ...AURORA WOODFIRES INSTALLATION AND USER MANUAL 61 266 874880 PO 347 BOX BYRON BAY NSW 2481 Locking Plates 3 INSTALLATION CONTINUED...

Page 15: ...nd the diameter of the firebox in all directions If installed directly on combustible material the floor protector must be made of a 30mm thick sheet of material with a thermal conductivity of a 0 21W...

Page 16: ...m thick material with thermal conductivity of 0 21w m k Floor protector laid directly onto timber joist as above Floor protector laid directly onto concrete with combustible floor surrounding it as ab...

Page 17: ...of the chimney IMPORTANT Misuse may lead to unhealthy and environmentally harmful emissions and will void any warranty or guarantee Burning only seasoned hardwood helps to protect the environment and...

Page 18: ...en proven durable colourfast and beautiful at temperatures to 1200 F Stove Bright high temperature paint has been air dried creating a quality coating To optimise the performance of the coating and to...

Page 19: ...re non toxic but may be uncomfortable for babies small children pregnant women elderly pets or anyone with breathing di culties INITIAL FIRING PROCESS 1 Slowly bring the stove to a medium burn about 2...

Page 20: ...TEST REPORT NUMBER 30A 14 0097 TRP 359162 0 TEST DATES 25 January 2015 to 30 January 2014 CONCLUSION This appliance meets the requirements of AS NZS 4013 2014 section 1 2 3 f TEST REPORT NUMBER 30A 14...

Reviews: