![Aumuller PLS S12 24V DC Assembly And Commissioning Instructions Download Page 27](http://html1.mh-extra.com/html/aumuller/pls-s12-24v-dc/pls-s12-24v-dc_assembly-and-commissioning-instructions_3016558027.webp)
27
Assembly Instruction
Spindle Drive PLS
NSK
06
A
SSEMBLY
FOR
SIDE
-
CLOSING
EDGE
OPERATION
ACTIVATION
ON
NSK
I
NSTALLATION
STEP
5
B
:
A
SSEMBLY
FOR
SIDE
-
CLOSING
EDGE
OPERATION
- NSK
FL
RA
!
Make sure they are parallel to casement edge.
Fit frame bracket
K127-1
.
!
LO
C
T
IT
E
!
Equipment: Casement bracket F11ST / F11VA
1x bolt Ø 8
1x washer
1x cotter pin
Secure fasteners against loosening; i. e. by applying
removable thread-locking compound such as “Loctite”.
Carefully clear away drilling swarfs to prevent
seals from being damaged.
Avoid surface scratches, for example by using
masking tape.
Determine fastenings.
Produce drill holes with appropriate cross-section.
For the mounting dimensions please refer to the
above-mentioned hole layout drawings (see chapter
„I
NSTALLATIONSTEP
3 + 4“) or project-specifi c documents
and
drawings).
Fit casement bracket
F11/ST / F11VA
.
Make sure it is parallel to casement edge.
„Casement bracket“ center and „spindle“
must be in line.
Ø6,6
M6
min. 40
min. 20
parallel
2
1
4
5
6
F11ST / F11 VA
K127-1
RA
RA
FL
FL
parallel
M6