COMfortel 1400 IP/2600 IP/3600 IP - Firmware V2.6 - Operation/Configuration - V05 09/2016
56
Commissioning
Overview of the Commissioning
Requirements:
•
A PC meeting minimum requirements (see chapter
)
•
A telephone, put into operation
•
Network cable
1. Switch the PC on.
2. Insert one cable end (RJ-45) of the network cable into the PC socket at
the bottom side of the telephone.
Important:
3. Insert the other cable end (RJ-45) of the network cable into a network
connection port of your PC.
Configuring the Telephone via the Configuration Manager
Connecting a PC to the network cable socket at the bottom side of the
telephone leads to malfunctions.
•
Therefore, note the socket labels.