4
2
Attach bracket to each side of the unit, using machine
screws with integral flat and lock washers. (M4 x 10).
In the vertical position, use holes 2 and 2' as shown
at left.
Mount the unit in place, using four self-tapping screws
(M5 x 12).
Use RTV (silicone sealer) on screw threads and around
the holes to prevent moisture intrusion.
Set the 2 anti-vibration springs to position "90".
Determine the mounting location, and drill four mounting
holes.
3
5
PROCEDURE FOR VERTICAL INSTALLATION W/O STUDS
Note
If the anti-vibration spring position has been changed and verified for vertical mounting (as shown on page 4), start with step 2.
1
Never mount the unit near the fuel tank.
NOTE: Use masking tape to cover unused
mounting holes on sides of unit.
MACHINE SCREWS
w/WASHERS (M4x10)
BRACKET
(Right Side)
BRACKET
(Left Side)
DRILL HOLES 4MM IN DIAMETER
SELF-TAPPING
SCREWS (M5 x 12)
BRACKET
(Left Side)
BRACKET
(Right Side)