7
Installation Preparation
Voltage Inspection
Check if voltage of DC power or external power supply is within the range of the Product’s
working voltage (13.5 V±10%).
Product Inspection
Power on and check if the Product is running normally by inspecting the status of all indicators on
front panel. Please refer to “Basic functional operation” for details.
Fittings Installation
Firstly install RF antenna, power adapter and LAN cable before the Product is powered on. Refer
to steps below for items installation.
Assemble /Disassemble of RF Antenna
Connect the threaded end of RF antenna to the RF antenna connector and fasten it. Rotate the
antenna anticlockwise to remove it.
Assemble/Disassemble of Power Adapter
Connect the 2 pins connector at power adapter to the power connector and then fasten it. Remove
the connector at cable end of power adapter to remove the power adapter.
Summary of Contents for CONVERGENCE
Page 1: ...1 Convergence User Manual 335100390_RevA ...
Page 18: ...18 ...