ATTACK PZO 120 Instructions For Use Manual Download Page 7

7

Control button

of regulation thermostat

Piezoelectric lighter

Gas supply 

to the main burner

Main gas supply

START AND PUTTING WATER STORAGE TANK TO OPERATION

Open the gas valve before the appliance.

Turn the control button of the gas fitting anticlockwise to the position of ignition burner („    “ 
pilot).

Press the control burner to stop and light the ignition burner by pressing the piezoelectric 
lighter. It is necessary to keep the control button pressed for 10–15 seconds (pict. No.1).

Release the control button and make sure whether flame of the ignition burner keeps on 
burning. If not, repeat the procedure again.

Set up the temperature required by the control button of the regulation thermostat.

Regulation of water temperature

By  a regulation button, switch-off temperature can be set up in the range of 40-70°C. We 
recommend to set the regulation button to 4-5 position. In this position we can reach the 
temperature of 55-60°C. For this temperature only minimum of incrustation is created. For fast 
heating of water in the tank it is possible to set up the button to level 7. At this level the 
incrustation is higher, so it is recommended only oaboutsionally. If flame of ignition burner is 
burning, thermal insulation of the heater enables keeping the temperature of heated water 
for a longer period without repeated ignition of the main burner.

Water temperature can be set up by the control button of the regulation thermostat like 
following:

Position 1 (about 40°C);      position 2 (about 45°C);    position 3 (about 50°C);           
Position 4 (about 55°C);      position 5 (about 60°C);    position 6 (about 66°C);      
Position 7 (about 72°C)      

SIT 630 EUROSIT GAS VALVE

Summary of Contents for PZO 120

Page 1: ...W W W A T T A C K S K DIRECTHEATEDGASTANKSFORD H W ATTACK PZO INSTRUCTIONS FOR USE...

Page 2: ...PERATION 6 Procedure of filling the tank with water 6 Checking the tank before ignition 7 Start putting the appliance to operation 8 Regulation of water temperature 8 Putting the storage tank out of o...

Page 3: ...o operation the ignition flame is burned with the help of a piezoelectric lighter that burns the flame of the main burner Heat arising from gas burning is transferred through the bottom of the steel t...

Page 4: ...um anodal bar Thermostat sleeve Main burner Gas valve Pilot burner Hot water inlet Hot water outlet 80 5 3 55 0 56 85 0 56 TYPE ATTACK PZ 80 ATTACK PZ 120 Volume L Power demand kW Heating time t 45 C...

Page 5: ...ny CONNECTINGTHEHOTWATERSTORAGETANKTOGASPIPE The assembly must be done by valid standards and precautions On the inlet of gas to the appliance there must be a closing element gas valve that should be...

Page 6: ...ossible to connectitwithaflueflapelectricallycontrolled Although technically it is possible to fit a bimetal flue flap due to low total savings because of somenegativeguidingsigns firstofallhighernois...

Page 7: ...rature By a regulation button switch off temperature can be set up in the range of 40 70 C We recommend to set the regulation button to 4 5 position In this position we can reach the temperatureof55 6...

Page 8: ...e15seconds Closingtimeisabout45secondsbutitcannotovercome60seconds TESTOFTHEDEVICE Whenputtingthedevicetooperationtheorganizationisobligedtocheck safetytimesofflamefuse adjustmentoftheappliancetoacert...

Page 9: ...maintenance of the storage tank which can prolong life and ensures operation without failures To make repairs and maintenance possible and easy there must be free approach to the storagetank Airsuppl...

Page 10: ...Onlyforqualifiedworkers Adjustmentoftheoutletpressure All the adjustments must be done according to technical parameters of the appliance Inlet and outlet pressure are checkedbyAandBoutlets Maximum pr...

Page 11: ...afterthe2ndyearofoperation Stamp signature of the service organization Date Data of the customer legibly Name and surname Street ZIP code town Tel Devicecommissioningreport Serial number Date of commi...

Page 12: ...ceho upozor nenia ATTACK s r o producer reserves the right to change technical parameters and dimensions of boilers without previous warning Der Hersteller ATTACK s r o beh lt sich das Recht der techn...

Reviews: