13
|
P a g e
d) Install
4
‐
AA
batteries
into
the
battery
chamber.
In
case
that
the
external
power
supply
is
desired,
connect
electrical
wires
per
the
wire
definition
in
Table
3.2.
Please
be
sure
of
the
power
supply
range
(i.e.,
5
~
24
VDC)
and
power
supply
polarization.
If
an
adapter
other
than
the
one
supplied
by
the
manufacturer,
make
sure
the
adapter
meets
industrial
standards
and
has
all
safety
certifications.
e) For
the
communication
wire
connection,
please
follow
the
description
in
Table
3.2
and
make
sure
that
the
wires
are
correctly
connected
to
the
proper
ports
on
your
data
device/equipment.
Please
make
sure
the
data
cable
meets
industrial
standards
with
proper
shielding.
f) Once
the
battery
is
installed,
or
the
external
power
is
successfully
connected,
the
LCD
should
be
lighted
up
with
the
proper
information
displayed
works
correctly.
g) Slowly
open
the
valve(s)
if
any,
upstream
or
downstream
or
both
of
the
pipeline,
and
the
meter
should
then
start
to
measure
the
flow
in
the
pipeline.
Note:
because
the
meter
has
a
large
dynamical
measurement
range,
it
could
be
normal
if
you
see
the
small
instant
flow
rate
before
you
open
the
valve
as
there
could
be
some
leakage.
However,
make
sure
the
meter
reads
null
when
there
is
no
flow
present
in
the
pipeline.
h) This
will
conclude
the
installation.
Cautions
a) Don't
alter
any
parts
of
the
product.
b) Ensure
the
electrical
connection
is
properly
done
per
the
instructions.
c) Make
sure
no
mechanical
stresses
in
the
connections.
d) The
strong
electromagnetic
interference
sources
close
by
or
any
mechanical
shocks
at
the
pipeline
may
also
create
malfunctioning
of
the
product.
e) Slowly
open/close
valves
to
prevent
abrupt
pulse
flow
impact.
MF5700
User
Manual
www.ato.com
18005851519
Global Shipping