2-7
FIGURE 2-7. INSTALLATION ONTO THE ATN THOR
1. Place the DVC onto ThOR rail (Figure 2-7). Be sure to engage
the recoil lug into the groove on the mounting surface.
NOTE
Operations with qRM of DVC are similar to the operations with
qRM described in Unit 2.2.1.
2. remove the protective cap from connector socket of Thor. Insert
Dvc connector to the socket.
FIGURE 2-8. CAMERA CABLE CONNECTION
CONNECTOR SOCKET
cable connecTor
proTecTIve cap
Summary of Contents for ThOR Series
Page 8: ...iii ...
Page 9: ...1 1 SECTION I introduction ...
Page 21: ...2 1 SECTION II assembly and preparation ...
Page 28: ...2 8 ...
Page 29: ...3 1 SECTION III OPERATION ...
Page 37: ...4 1 SECTION IV maintenance instructions ...
Page 43: ...4 7 ...