Maintenance Schedule
32
PX-16A
Maintenance Schedule
Monthly:
1. Re-torque the anchor bolts to 86 foot pounds.
2. Check
all
fi
ttings, bolts and pins to insure proper mounting.
Note:
All anchor bolts should take full torque. If any of the bolts does
not function for any reason,
DO NOT
use the lift until the bolt has been
replaced.
3. Make a visual inspection of all hydraulic hoses/lines for possible wear or
leakage.
4. Adjusting the lifting level on both platforms.
5. Lubricate all moving parts with lubricant
(Sea Fig. 39-42)
.
For shaft of piston
rod of Main cylinder
Fig. 40
For Main Cylinder
Fig. 39
For pins of connecting
platforms and scissors
Fig. 41
For pins of connecting
platforms and scissors
Fig. 42
Summary of Contents for PX-16A
Page 1: ......
Page 8: ...Installation Steps 8 PX 16A 1 2 Illustration for on surface installation See Fig 4 Fig 4...
Page 10: ...Installation Steps 10 PX 16A 2 2 Illustration for flush mount installation Fig 6 Fig 6...
Page 37: ...Exploded View 37 PX 16A Control Cabinet Fig 33...
Page 38: ...Exploded View 38 PX 16A Atlas Electric Power Unit 220V 50HZ 1Phase 380V 50HZ 3 Phase Fig 34...