Test Run
30
PX-16A
b. Turn the handles of the both shutoff valves to the oil
fi
lling position show as
Fig. 37
Normal Working Position
Oil Filling Position
Fig. 36
Fig. 37
c. Press the
UP
button and the Red Button beside the oil-water separator as
Fig. 35
to
fi
ll the oil into both secondly cylinders until it is full (to the highest
position).
d. Turn both handles of the shutoff valves to normal working position
(See Fig.
36)
, press the button
Down,
the lift start to be lowered (If the lift can’t be
lowed down, turning the handle lever of one valve to oil
fi
lling position shown
as
Fig. 37,
then quickly turn the handle lever to normal working position, and
adjusting another valve with the same way), then the lift can be lowered. Lower
the lift to the lowest position.
e. Repeat the above procedure
a
to
d
more times, bleeding the air in the cylinder
then the lift would be synchronous worked.
3. Test
run
Check the height limit switch, the hose and
fi
tting connection, and do test
run. The lift must be tested run and checked carefully before in use.
Summary of Contents for PX-16A
Page 1: ......
Page 8: ...Installation Steps 8 PX 16A 1 2 Illustration for on surface installation See Fig 4 Fig 4...
Page 10: ...Installation Steps 10 PX 16A 2 2 Illustration for flush mount installation Fig 6 Fig 6...
Page 37: ...Exploded View 37 PX 16A Control Cabinet Fig 33...
Page 38: ...Exploded View 38 PX 16A Atlas Electric Power Unit 220V 50HZ 1Phase 380V 50HZ 3 Phase Fig 34...