Installation
29
PV-15P
• If latches click out of synchronization, tighten the cable on the one that
clicks fi rst;
• Fill with more fl uid if necessary till the tank is full.
7.16 Installation Of Arms
• Raise the carriages to a convenient height;
• Install the swing arms on the carriages using
the included pins as shown;
• Check for proper engagement of the arm
lock – the teeth on the lock should fully
engage the gear on the arm. If arm pins are
not fi tting, pull up on arm lock to allow slack
for the arm to move around in the carriage,
allowing the arm pin to fi t easier.
7.17 Check Before Start-Up
7.17.1 GENERAL CHECKS
• Make sure that the columns are plumb;
• Make sure the lift anchored to the ground and all anchor bolts tightened.
• Make sure the electrical system feeding voltage is equal to that specifi ed in
the nameplate on the motor;
• Make sure the electric system connection in conformity of the electric plan
shown as the electric diagram (fi g. 6) and for proper grounding.
• Particularly, below checks must be followed:
7.17.2 MECHANICAL SAFETIES FOR PROPER INSTALLATION
• Check to make sure that safety latches will properly engage and disengage
by manual release;
• If latches click out of synchronization, tighten the cable on the one that
clicks fi rst.