![Atlas AE 60 Operating Instructions Manual Download Page 7](http://html.mh-extra.com/html/atlas/ae-60/ae-60_operating-instructions-manual_3001609007.webp)
PennEngineering • www.pemnet.com
7
You need to top up the oil-dynamic circuit after a long period of work, when you note a power loss. Put the
riveting tool (DWELL AND NOT FED) in a horizontal position and remove the plug (A), by means of a 5 mm
Allen wrench (equipped with the riveting tool); during this operation, check the oil level in order to avoid
any overflowing Then, slowly pour the oil PANOLIN HLP ISO 32into the bellows container (X) which shall
be screwed to its seat on the plug (A). While keeping the riveting tool in a horizontal position and start-
ing air feeding, push the tensile strength button and make the riveting tool carry out some cycles until air
bubbles inside the container (X) stop coming out. This condition indicates that the topping off the oil has
fully been achieved. At this point stop the air feeding and, while keeping the riveting tool in a horizontal
position, unscrew and close up the container (X) and the plug (A).
WARNING!
Before disconnecting the compressed air hose, make sure that it is not under pressure! We
recommend to use oil PANOLIN HLP ISO 32 DIN 51524-2/HLP or similar.
TOPPING UP THE OIL-DYNAMIC CIRCUIT
Warning:
Make sure that the oil filler cap
(A) is tightened at a torque corresponding
to Min. 5 Nm ÷ Max. 8 Nm.
Summary of Contents for AE 60
Page 1: ...AE 60 Operating Instructions ...
Page 8: ...8 PennEngineering www pemnet com SPARE PARTS METRIC TOOL ...
Page 10: ...10 PennEngineering www pemnet com SPARE PARTS METRIC TOOL ...
Page 12: ...12 PennEngineering www pemnet com SPARE PARTS UNIFIED TOOL ...
Page 14: ...14 PennEngineering www pemnet com SPARE PARTS UNIFIED TOOL ...