6
PennEngineering • www.pemnet.com
CHANGE OF SIZE
Depending on insert thread, it is necessary to replace the couple “tie-rod/head” as follows:
Picture 1. Loosen the ring nut by means of a 25-mm standard spanner and remove the riveting tool head.
Picture 2. Make the pin supplied pass through the pertinent service hole located on the cone carrying
head and apply a light pressure on the head inwards, in order to dechuck the tie rod clutch, at the same
time, unscrew the tie rod and extract it.
Picture 3-4. Keep the clutch dechucked and screw the tie rod size desired. When the replacement of the tie
rod has been performed, swing it until you hear a click. The assemble the proper head and lock it with the
corresponding ring nut loosen before. Each time you carry out and change of size, repeat the adjustment
operations as specified in the previous pages.
WARNING!
DISCONNECT AIR FEED WHEN PERFORMING THOSE OPERATIONS.
Summary of Contents for AE 60
Page 1: ...AE 60 Operating Instructions ...
Page 8: ...8 PennEngineering www pemnet com SPARE PARTS METRIC TOOL ...
Page 10: ...10 PennEngineering www pemnet com SPARE PARTS METRIC TOOL ...
Page 12: ...12 PennEngineering www pemnet com SPARE PARTS UNIFIED TOOL ...
Page 14: ...14 PennEngineering www pemnet com SPARE PARTS UNIFIED TOOL ...